Appendix
16
Installation and maintenance instructions auroSTOR 0020221298_04
Appendix
A
Detecting and eliminating faults
Fault
Possible cause
Remedy
No flow rate at the valve
1.
Water supply valve closed
2.
Main filter blocked
3.
Pressure reducer not installed correctly
1.
Check and open the valve.
2.
Close the water supply valve, clean the filter
and the water pressure reducer.
3.
Check whether the pressure reducer has been
installed correctly.
Low flow rate and pres-
sure at a valve
1.
Filter in cold water supply clogged
1.
Close the cold water supply, clean the filter for
the water pressure reducer.
Water from the valve is
cold
1.
The cylinder was not set or is not operating.
2.
The heat generator does not work.
3.
The thermal cut-out was triggered.
4.
The 2-port motorised valve is not working
5.
The immersion heater does not work.
1.
Check the thermostat or the room thermostat
and, if required, set this.
2.
Check the heat generator; a fault code is
present.
3.
Check and initialise the cylinder.
4.
Check the valve's connections.
5.
Set the thermostat or the room thermostat.
Domestic hot water
temperature too high
1.
Use a thermometer to check the temperature; it
must be between 60 and 65 °C.
2.
Check the cabling.
3.
Thermostat set too high
4.
Defective thermostat
1.
Install a mixer tap.
2.
Repair the cable.
3.
Reduce the temperature of the thermostat to
55 °C.
4.
Replace the thermostat.
Irregular domestic hot
water output at the valve
1.
Defective expansion vessel
2.
Thermal control
1.
Set the expansion vessel.
2.
Interrupt the power supply of the product and
heat generator, check the thermal cut-outs and
replace these if you find any defects.
B
Inspection and maintenance work
–
Overview
N°
Work
Maintenance-re-
lated interval
1
Check the connections for tightness.
Annually
2
Check the temperature and pressure expansion relief valve.
Annually
3
Check the expansion relief valve.
Annually
4
Check the pressure in the expansion vessel.
Annually
5
Check the domestic hot water output at the valve (if required, clean the filters).
Annually
6
Check the target domestic hot water temperature.
Annually
7
Check whether the thermostatic mixing valve is working.
Annually
8
Fill out the cylinder's benchmark checklist.
Annually
C
Technical data
Technical data
–
General
VIH S GB 200/3
BES
VIH S GB 250/3
BES
VIH S GB 300/3
BES
Actual volumetric capacity
191.0 l
241.8 l
281.3 l
Heating circuit hot water volumetric capacity in
accordance with EN 12897
127.0 l
148.0 l
159.0 l
Hot water volumetric capacity of the solar circuit
187.0 l
231.0 l
249.7 l
Maximum pressure of the heating tube coil dur-
ing operation
0.35 MPa
(3.50 bar)
0.35 MPa
(3.50 bar)
0.35 MPa
(3.50 bar)
Operating pressure
0.35 MPa
(3.50 bar)
0.35 MPa
(3.50 bar)
0.35 MPa
(3.50 bar)
Maximum operating pressure
0.7 MPa
(7.0 bar)
0.7 MPa
(7.0 bar)
0.7 MPa
(7.0 bar)