Installation instructions neutralisation device

8

Notes on the documentation

The following information is intended to help you 
throughout the entire documentation.
Further documents apply in combination with this 
installation manual.

We accept no liability for a damage caused by failure to 
observe these instructions.

Attachment and storage of the documents

Please pass this assembly manual on to the owner of the 
system in order for him or her to store it so that it is 
available whenever it is required.

Symbols used

Please observe the safety instructions in this manual for 
the installation of the neutralisation device!

d

 Danger!

Immediate risk of serious injury or death!

a

 Caution!

Potentially dangerous situation for the product 
and environment!

h

 Note!

Useful information and instructions.

•  Symbol for a necessary task

1  

General information

The neutralisation device with feed pump,
Part No. 301 374, provides neutralisation of condensed 
water from boilers and/or flue pipe systems made of 
stainless steel, plastic and ceramics.
The condensed water from the condensing unit is fed 
into a vessel. In the vessel there is neutralising medium 
which lifts the pH value of the condensed water to a 
neutral level. The neutralisation medium can be replaced 
via a removable cover.
A feed pump pumps the neutralised condensed water 
through a drain hose, controlled by the level of water, 
over a height difference of up to 2 metres. It can then be 
directed into the sewage system from this location.
The operating conditions of the unit are displayed. In the 
event of a fault the boiler is temporarily switched off via 
an error signalling line which is connected directly into 
the System ProE Switching Field of the condensing 
boiler until the fault is resolved. This prevents 
condensed water from coming out of the unit into the 
room.

2   Safety instructions

d

 Danger!

Switch the power supply off before opening the 
cover on the feed pump control!

3 Fitting

d

 Danger!

Switch the condensing boiler off before fitting 
the device (mains switch and fuses)!

a

 Caution!

The neutralisation device must be mounted 
horizontally. The bottom of the neutralisation 
device must be at least 90 mm lower than the 
condensed water drain connection on the 
condensing boiler.

2x

4x

2
3
4

5

12

9
10

8

7

6

13

14

1

11

Fig. 3.1   Overview of the neutralisation device 

Key

1  Neutralisation box with integrated feed pump
2  Connection for drain hose
3 Overflow
4  Mains and connection cable
5 Plug 

connection

6 Neutralisation 

granulate

7  Hose clamps (4 off)
8  Connection adaptor on the condensed water drain DN 40 on the 

boiler

9  Angle piece 20x20 for infeed connection
10  T piece 20x20x20 for connecting the chimney stack water 

drainage

11  Drain hose DN 10x3 m
12 Infeed hose
13  Operating and fault display
14  Connection for infeed hose

Notes on the documentation, 1 General
2 Safety instructions, 3 Installation

Содержание 301 374

Страница 1: ...301 374 DE GB...

Страница 2: ......

Страница 3: ...F r den Fachhandwerker Montageanleitung Neutralisationseinrichtung mit F rderpumpe bis 200 kW Gas Brennwertkessel DE...

Страница 4: ...Kondens wasser durch einen Ablaufschlauch f llstandsgesteuert ber bis zu 2 Meter H henunterschied Dort kann es in die Kanalisation eingeleitet werden Die Betriebszust nde des Ger tes werden angezeigt...

Страница 5: ...Inbetriebnahme Stecken Sie das 5 polige Netz und Verbindungska bel 4 auf den Gegenstecker der Neutralisationsein richtung Der Stecker muss einrasten Verbinden Sie den wei en Stecker der Signalleitung...

Страница 6: ...Aufgebrauchtes Neutralisa tionsmittel ist zu ersetzen Die Wirksamkeit der Neutrali sation wird mittels pH Papier kontrolliert Dazu wird das pH Papier mit ablaufendem Kondenswasser aus dem Ab laufschl...

Страница 7: ...For the heating engineer Installation Manual Neutralisation Device with Feed Pump up to 200 kW Gas condensing boiler GB...

Страница 8: ...drain hose controlled by the level of water over a height difference of up to 2 metres It can then be directed into the sewage system from this location The operating conditions of the unit are displ...

Страница 9: ...and connection cable 4 onto the opposing plug of the neutralisation device The plug must click in position Connect the white plug of the signal line to the ProE switching field of the condensing boile...

Страница 10: ...ld be replaced The effectivity of the neutralisation is checked using pH paper This is done by wetting the pH paper with the condensed water draining from the hose If you obtain a reading of less than...

Страница 11: ......

Страница 12: ...832977_03 DEGB 012007...

Отзывы: