COMMISSIONING
60
Table of plug connector assignments
Table, air gap "A"
Conductor system types
Plug connector (copper)
63-100 A
120-140 A
VKS10-4/63-100
L1; L2; L3; PE
-
VKS10-4/120-140
PE
L1; L2; L3
VKS10-5/63-100
L1; L2; L3; PE; 1
-
VKS10-5/120-140
PE; 1
L1; L2; L3
VKS10-6/63-100
L1; L2; L3; PE; 1; 2
-
VKS10-6/120-140
PE; 1; 2
L1; L2; L3
VKS10-7/63-100
L1; L2; L3; PE; 1; 2; 3
-
VKS10-7/120-140
PE; 1; 2; 3
L1; L2; L3
VKS10-8/63-100
L1; L2; L3; PE; 1; 2; 3; 4
-
VKS10-8/120-140
PE; 1; 2; 3; 4
L1; L2; L3
VKS10-9/63-100
L1; L2; L3; PE; 1; 2; 3; 4; 5
-
VKS10-9/120-140
PE; 1; 2; 3; 4; 5
L1; L2; L3
VKS10-9/200
2x L1; 2x L2; 2x L3; PE; 1; 2
-
VKS10-9/240-280
1; 2
2x L1; 2x L2; 2x L3; PE
VKS10-10/63-100
L1; L2; L3; PE; 1; 2; 3; 4; 5; 6
-
VKS10-10/120-140
PE; 1; 2; 3; 4; 5; 6
L1; L2; L3
VKS10-10/200
2x L1; 2x L2; 2x L3; PE; 1; 2; 3
-
VKS10-10/240-280
1; 2; 3
2x L1; 2x L2; 2x L3; PE
Installation temperature [° C]
-30
-20
-10
0
10
20
30
40
Air gap "A" standard [mm]
6 m sections
-
-
5
4
3
2
1
0
Air gap "A" deep-freeze warehouse
[mm]
4 m sections
4.2
3.5
2.8
2.1
1.4
0.7
0
-
Содержание VKS10
Страница 86: ...MAINTENANCE 84 Connector cap moving along the rail before Connecting cap moving along the rail after ...
Страница 87: ...MAINTENANCE 85 Reversal points moving along the rail before Reversal points moving along the rail after ...
Страница 89: ...MAINTENANCE 87 Connecting caps mast assembly before Connecting caps mast assembly after ...
Страница 96: ...PROTECTIVE MEASURES 94 10 PROTECTIVE MEASURES 10 1 EU conformity declaration ...
Страница 99: ...CE Technical Documentation DQS certified in accordance DIN EN ISO 9001 2015 OHSAS 18001 2007 ...