COMMISSIONING
20
Attaching the system
Requirements:
The hole pattern is prepared according to side
18.
Assembly steps:
1. Clips the hangers in the bar so that they audibly
engage.
2. Place the bars on the hangers in the prepared
bore holes.
Connection
Assembly steps:
1. Attach the flat plug to the + or - pole.
2. The additional - pole can be used for grounding
the steel structure.
5.2.3
Installing current collector
Requirements:
The support component for the current collector
has been prepared. Observe the installation di-
mension of the current collector (see Current col-
lector page 16)
Customer-side cabling
Required tools:
⚒
Screwdriver
Assembly steps:
1. Attach the current collector to the support com-
ponent.
2. Attach the flat plug.
Содержание SLSM
Страница 2: ......
Страница 32: ...CE Technical Documentation DQS certified in accordance DIN EN ISO 9001 2015 OHSAS 18001 2007...