Instructions and settings
62
Ver.2 01.11.2002
Table 3.3 The most common tramlining systems on the RDA 500 S
Tramline,
spacing
Tramlining
programme
Start- value Note
10 m
2
1
First bout: drive with half the drill shut off
Second bout: overlap half the first bout.
15 m
3
2
20 m
4
2
First bout: drive with half the drill shut off
Second bout: overlap half the first bout.
25 m
5
3
Table 3.4 The most common tramlining systems on the RDA 600 S
Tramline,
spacing
Tramlining
programme
Start- value Note
12 m
2
1
First bout: drive with half the drill shut off
Second bout: overlap half the first bout.
18 m
3
2
24 m
4
2
First bout: drive with half the drill shut off
Second bout: overlap half the first bout.
30 m
5
3
36 m
6
3
First bout: drive with half the drill shut off
Second bout: overlap half the first bout.
Table 3.5 The most common tramlining systems on the RDA 800 S
Tramline,
spacing
Tramlining
programme
Start- value Note
16 m
2
1
First bout: drive with half the drill shut off
Second bout: overlap half the first bout.
24 m
3
2
32 m
4
2
First bout: drive with half the drill shut off
Second bout: overlap half the first bout.
Содержание Rapid RDA 800S
Страница 1: ...Ver 2 01 11 2002 900225 en Instructions Seed drill RAPID series RDA 500 800 S No 12 000 12 799 ...
Страница 2: ...2 Ver 2 01 11 2002 ...
Страница 4: ...4 ...
Страница 73: ...RDA 500 800 S Ver 2 01 11 2002 73 ...
Страница 75: ...RDA 500 800 S Ver 2 01 11 2002 75 Figure 5 4 ...
Страница 105: ...RDA 500 800 S Ver 2 01 11 2002 105 ...
Страница 106: ...Appendices 106 Ver 2 01 11 2002 7 3 Hydraulic diagram 7 3 1 Hydraulic diagram RDA 500 600 S Figure 7 1 428717 ...
Страница 108: ...Appendices 108 Ver 2 01 11 2002 7 3 2 Hydraulic diagram RDA 800 S Figure 7 2 428718 ...
Страница 110: ...Appendices 110 Ver 2 01 11 2002 7 3 3 Fenix fläkt standard Figure 7 3 A Hydraulic motor B Valve block C Tractor B A C ...
Страница 121: ......