
10
Item
Description
Quantity
A
Lithium battery pack
1
B1
Positive output power cable
1
B2
Negative output power cable
1
B3
Positive power parallel cable (*Optional)
1
B4
Negative power parallel cable (*Optional)
1
C1
Communication cable
1
C2
Parallel communication cable(*Optional)
1
D
GND cable
1
E
Resistance connector
1
F
Protection cover, red & black
2
G
Mounting base
1
H
Expansion screw
2
I
Spirit level
1
J
User manual/Packing List/Warranty card
1
2.2.3
Unpacking Acceptance
After receiving the goods on-site, please check whether the packing box is intact and inspect the goods
in time. If the packing box is slightly damaged, please sign the cargo list to confirm receipt and indicate
the extent of the damage. If the damage of the packing box is serious, please refuse to sign.
Please carry out an unpacking inspection after receiving all the goods. If users find that the received
goods do not match the packing list, please contact Vestwoods as soon as possible.
2.3
Installing Guide
Context
Before installing the V-Power S14, users need to plan the installation site. The installation site should
comply with the following conditions:
The installation site should be able to place one V-Power S14, and there should be a wall to mount
the inverter.
A 500 mm ventilation and operation space should be reserved at the right of the V-Power S14.
If possible, the installation site should be as spacious and ventilated as possible. If the site is small
and confined, please configure auxiliary heat dissipation equipment.
Procedure