1
Assembly
Beny Sports Co. UK Ltd
Unit 8, Riparian Way,
The Crossings, Cross Hills,
West Yorkshire.
BD20 7BW
Carefully unpack each component, checking against the parts list that
you have all the necessary parts to complete the assembly of your
product.
Please note that some of the parts may be pre-fitted to major
components, so please check carefully before contacting our
CUSTOMER SUPPORT team.
In any event, please do not return the product to your retailer before
contacting us first.
Tel:- 01535 637711 or
Fax:- 01535 637722 or
E-mail:- [email protected]
CUSTOMER SUPPORT is open from 9.00am to 5.00pm from Monday
to Friday
Do NOT FULLY TIGHTEN any
Bolts, Nuts or Fittings at this
stage unless specifically
instructed to do so.
Note
65
65
Assemble the Front and Rear Stabilisers (3 & 4) to the Main Frame (1) using 2 x M10 x 57mm
Carriage Bolts (12), 2 x M10 Curved Washers (13), 2 x M10 Spring Washers (65) and
2 x M10 Dome Nuts (14) for each Stabiliser. Tighten all Bolts and Nuts securely.
Page 1
7
Содержание KP2071
Страница 2: ......
Страница 22: ...Assembly 41 65 66 80 77 79 78 76 75 74 Page 22...