background image

Remove all components from crate. It may be to the 

1. 

installer’s advantage to place the cast iron boiler block 

close to where the final installation location will be.

Boiler may be piped and pressurized before 

installing jackets & components.

NOTICE

Attach top and bottom rear intermediate panels with 

2. 

5/16”x1/2” bolts & washers. Be sure top flanges point 

toward the front of the boiler. Bottom panel flanges 

will point rearward. Hold bottom flange to top of holes 

while tightening bolts. See

 Figure 1

.

Figure 1

Bottom Intermediate

Top Intermediate

Rear of Boiler

 P/N 240007211, Rev. B [06/08]

KNOCKDOWN ASSEMBLY

Instructions for

TriFire Oil Fired Boiler

SUPPLEMENT

AL INSTRUCTIONS

This assembly must be completed by a qualified installer or service agency, in accordance with the 

manufacturer’s instructions, and in accordance with all codes and requirements of the authority having 

jurisdiction. Failure to follow these instructions could result in fire or explosion resulting in property dam

-

age, personal injury, or loss of life.

WARNING

!

  

Wrap insulation around boiler with the smooth side out. 

3. 

Be sure to overlap underneath boiler. Wrap 2 banding 

strips around insulation and tie as shown in 

Figure 2

Cut off excess banding material. The rear insulation is 

not installed until step 11.

Figure 2

1

Содержание TriFire

Страница 1: ... Rear of Boiler P N 240007211 Rev B 06 08 KNOCKDOWN ASSEMBLY Instructions for TriFire Oil Fired Boiler SUPPLEMENTAL INSTRUCTIONS This assembly must be completed by a qualified installer or service agency in accordance with the manufacturer s instructions and in accordance with all codes and requirements of the authority having jurisdiction Failure to follow these instructions could result in fire ...

Страница 2: ...rol panel on the top of the boiler with the burner wire harness on the right See Figure 5 Figure 5 Attach the control panel to the left side jacket The 7 slot on the front of the control panel will slide over the screw in the side jacket panel See Figure 5A Figure 5A Attach the right side jacket panel to the boiler and 8 control panel like the left side At the rear of the boiler be sure the panel ...

Страница 3: ...n on the rear of the boiler 11 Attach the lower rear Insert the tabs into the slots 12 provided Do not attach the upper rear panel yet Pipe nipples removed for clarity Figure 8 You may now tighten down the control panel and side 13 panel hardware You may have to pull the front switch out in order to completely fasten the screws See Figure 9 Figure 9 Slot Screw Attach the top panel to the side pane...

Страница 4: ...e 9 Figure 9 Attach the front panel by setting onto the rivets in the 16 side jackets See Figure 10 Figure 10 Proceed to the section Packaged Boiler Assembly in 17 the Installation Operation and Maintenance manual 4 KNOCKDOWN BOILER ASSEMBLY For technical assistance with this product call toll free 1 800 325 5479 ECR International PO Box 4729 Utica NY 13504 4729 www ecrinternational com ...

Отзывы: