background image

 

-1-   

 

-2- 

 

-3- 

 

-4- 

 

  Packing List 

Please  check  the  following  items  after  unpacking,  if  any  missing,  please 
contact your local dealer. 

No. 

Items 

Quantity 

Switch 

Power Cable 

Console cable 

Grounding cable   

Rack mount brackets 

Rubber pads   

Screw package   

Quick Installation Guide 

Warranty card   

10 

QC card   

 

  Safety Information 

Before performing an operation, read the following operation instructions and 
precautions to be taken, and follow them to prevent accidents. 

2.1  General Requirements 

  Only qualified and skilled personnel must install, configure, and unmount 

the device. The device must not be disassembled. 

  When operating the device, obey the local safety regulations. The safety 

precautions provided in the document are supplementary and shall be in 
compliance with the local safety regulations. 

  When operating the device, in addition to the precautions (please see the 

notes below), follow the specific safety instructions. 

  The installation and maintenance personnel need to understand the basic 

safety precautions to be taken. 

  Do not block the ventilation while the device is running. Keep a minimum 

distance of 5 cm from the ventilation to the walls or the other objects that 
block the ventilation. 

  Do  not  operate  the  device  in  an  area  that  exceeds  the  maximum 

recommended ambient temperature. 

  Do  not  place  the  device  in  the  environment  that  has  inflammable  and 

explosive air or fog. Do not perform any operation in this environment. 

2.2  Electric Safety 

  During the installation of the AC power supply facility, follow the local safety 

regulations. The personnel who install the AC facility must be qualified to 
perform high voltage and AC operations. 

  Before  touching  the  device  or  hand-operating  parts,  wear  a  grounded 

electrostatic  discharge  (ESD)  wrist  strap.  It  can  prevent  the  sensitive 
components from damage by the static electricity in the human body. 

2.3  Optical Safety 

  When handling optical fibers, do not stand close to, or look at the optical 

fiber outlet directly with unaided eyes. 

  Cutting and splicing fibers must be performed by the trained personnel only. 

  Before cutting or splicing a fiber, ensure the fiber is disconnected from the 

optical source. After disconnecting the fiber, use protecting caps to protect 
all the optical connectors. 

 

  Product Introduction 

3.1  Overview 

This series of switches is enterprise-class stackable routing switch with fixed, 
built-in 10GbE uplink ports. It has great performance on availability, scalability, 
security  and  energy  efficiency.  This  fully  managed  switch  provides  high 
switching  capacity,  supports  wire-speed  L2/L3  forwarding  and  high  routing 
performance for IPv4 and IPv6 protocols. Thanks to the VSF (Virtual Switch 
Framework), the management work for the network administrator is simplified. 
Multiple  switches  can  be  virtualized  into  one  logical  device,  achieving  the 
sharing  of  information  and  data  tables  between  different  switches,  which 
provides more reliability. It delivers high-performance, hardware-based on IP 
routing. RIP, OSPF, and BGP provide dynamic routing by exchanging routing 
information with other Layer 3 switches and routers. It is ideal for aggregation 
or  access  layer  for  campus,  enterprise,  government  and  internet  service 
provider networks. 

 

 

 

 

3.2  Hardware Introduction 

28-Port Switch

 

 

28-Port PoE Switch 

 

52-Port Switch 

 

52-Port PoE Switch

 

 

 

LED Indicators Instructions 

LED Symbol

 

Status

 

Description

 

PWR 

On (Green) 

Power is operating normally 

Off 

Power is not operating 

DIAG 

On(Green, 
blink) 

System is loading 

On (Green) 

System is operating normally 

RPS 

On (Green) 

DC power is operating normally 

Off 

DC power is not operating 

PoE 

On (Green) 

PoE is operating normally 

Off 

PoE is not operating 

MGMT 

On (Green) 

Network management port 10M / 
100M / 1G is linking 

Off 

Network management port is not 
linking 

Blink 

Data forwarding 

 

  Installations 

This series switch supports three installation modes: 

  Rack mounted installation 

  Desktop installation 

  Wall mounted installation 

 

4.1  Rack Mounted Installation 

This  switch  supports 

19”  rack  mounted  installation.  Following  with  the 

installation steps below. 

Step 1: Fix the provided rack mounted hangers to the left and right 
side of the device using 4 screws each. Use the four holes on the 
left and right side of the device. 

Accessories 

 

   

 

Step 2: Install the switch to the rack. The distance between the devices in the rack 
should be more than 5cm. 

           

 

 

4.2  Desktop Installations 

This series of switches support desktop installation. Users can put this product 
on clean, stable, grounded workbench.   

Please follow the steps below: 

  Carefully  put  the  device  upside  down,  clean  the  grooves  on  the  chassis 

backplane with soft cloth to make sure there is no oil or dust in it. 

  Remove the stickers on the foot pad, paste the foot pad on the four corners 

at the bottom of the switch.   

  Carefully put the device upright on the workbench. 

 

4.3  Wall-mounted Installations 

Drill  4  holes  on  the  wall  where  the  device  is  installed  according  to  the 
dimensions  of  the  switch  and  accessories.  Insert  an  expansion  anchor  into 
each hole drilled in the wall, and beat the top of it with a rubber hammer until 
all the anchor is inserted into the wall. 

Please follow the steps below: 

Fix the provided rack mounted hangers to the left and right side of the device 
using 4 screws each. Use the four holes on the left and right side of the device. 

Fix to the switch to the wall.   

 

 

  Connect the Power Supply 

Note: 

Ground the switch housing with the grounding screw on the side of the 
housing! Always make the ground connection first and disconnect it at the end. 

Use one end of PGND cable to connect the  M4 grounding connector of the 
switch, the other end to a ground point. The PGND of the switch is shorted to 
the copper protection ground bar provided by the user. The PGND cable used 
should be an alternating yellow and green plastic insulating one with copper 
core, with cross-sectional area greater than 2.5mm². 

The figure below takes rack-mounted installation as example. 

Ground the switch housing 

 

 

 

 

This series switch supports 100~240V AC power supply. 

100~240 V AC Supply 

Use an AC power cable to connect the AC power connector of the switch. It is 
recommended to use the AC power cable provided in the package. Connect 
the mains supply to the building’s power supply network. 

Please observe the following specifications: 

Items 

Specifications 

Input Voltage 

100~240V AC, 50~60Hz 

 

5.1  Starting Up 

After  connection  to  the  power  supply,  the  switch  starts  automatically.  LED 
indicators “PWR” turns green, and after about 90s, the system is ready. 

Note: 

To switch off the device, always disconnect both the main and redundant 
power supply. 

 

  Factory Settings 

Note: 

Please note that the factory settings may change with future firmware versions. 
For this reason we recommend that you check the release notes for 
information about any changes to the factory settings before carrying out a 
firmware update. 

The switch starts with its factory settings: 

Items 

Specifications 

Management Interfaces 

Console Port 

Enabled 
Baud rate: 115200 bit/s 
Data bits: 8 
Parity: none 
Stop bits: 1 
Flow control: none 

Web Manager 

Enable 

Default static IP address: 192.168.1.200 

Default subnet mask: 255.255.255.0 

User: admin 

Password: admin 

Telnet 

Disable,  to  enable  the  Telnet,  users  should 
configure the IP addresses for the switch and 
start the Telnet Server function on the switch. 

 

  Access Network Management 

After  starting  up  successfully,  connect  the  switch  to  your  local  network 
segment  using  a  suitable  cable  to  access  the  switch  network  management 
system. For details, please refer to the following document:   

  Management Configuration Guide 

Describes network management system configuration instructions. 

 

  Specifications 

Items 

28-Port Switch   

28-Port PoE Switch   

Hardware Specifications 

Downlink Port 

24*10/100/1000 
Base-T RJ-45 ports   

20*10/100/1000 Base-T 
PoE+ RJ-45 ports 
4*1000Mbps Combo   
(RJ-45/SFP) 

Uplink Port 

4*10GE Base-X SFP+ 

Management 
Port 

1*RJ-45 Ethernet management port 

1*Console port   

1*Reset port   

1*USB2.0 interface   

Cable 

Cat5 or better 

Dimensions 
(W*D*H) 

440mm*320mm*44mm   

Power Supply 

AC: 100~240VAC, 
50~60Hz 

AC: 100~240VAC, 
50~60Hz 

Power 
Consumption 

<30W(Full load) 

<471W(Full  load,  include 
PoE) 

Material 

Metal shell 

Switch Property 

Forwarding 
Modes 

Store and Forward 

Отзывы: