USTER®
HVI 1000
Instruction Manual
Uster Technologies, Inc.
Chapter 2
(10/07) Installation
-
Page 2-1
Chapter 2
Installation
1
Overview
The
HVI 1000
system is shipped in two separate crates containing the
module cabinets, peripherals, and some of the internal parts of the
system. Report any loss or damage to the carrier immediately.
When the system is received or shortly thereafter, an Uster service
technician will arrive to complete installation.
ATTENTION:
DO NOT attempt to set up the system by yourself!
ATTENTION:
If the system is to be stored before being used, inside
storage is required in a location protected from excess
moisture, corrosive atmospheres, and chance of physical
damage.
Conditioned storage is RECOMMENDED, but not required.
If the instrument has been exposed to a cold
environment, condensation may form on cold surfaces
when the instrument is moved into a warm area. Allow
the instrument to warm and dry thoroughly before
proceeding with installation.
The procedures given in this chapter are to be performed for each
cabinet with the assistance of an Uster service technician or an
authorized Uster Technologies’ agent.
Содержание HVI1000
Страница 2: ......
Страница 24: ...USTER HVI 1000 Instruction Manual Uster Technologies Inc Chapter 1 3 08 Introduction Page 1 10 ...
Страница 50: ...USTER HVI 1000 Instruction Manual Uster Technologies Inc Chapter 3 3 08 System Startup Page 3 16 ...
Страница 174: ...USTER HVI 1000 Instruction Manual Uster Technologies Inc Chapter 8 5 08 System Diagnostics Page 8 38 ...
Страница 192: ...USTER HVI 1000 Instruction Manual Uster Technologies Inc Chapter 10 3 08 Maintenance Page 10 6 ...
Страница 230: ...USTER HVI 1000 Instruction Manual Uster Technologies Inc Chapter 12 7 07 Appendix Page 12 30 ...
Страница 236: ...USTER HVI 1000 Instruction Manual Uster Technologies Inc Chapter 13 3 08 Index Page 13 6 W Warm Up Color Head 8 6 ...
Страница 238: ......