6
USSC
INSTALLATION OPTIONS
Read this entire manual before you install and use your Multi-Fuel Furnace. Failure to follow instructions
may result in property damage, bodily injury, or even death!
(See specific installation details for clearances and other installation requirements)
As a
Primary Furnace
—the unit functions independently of any other system. The “Room Air” blowers will come on
when the plenum and Exhaust temperatures reach a preset point on the furnace’s circuit board (PCB). Unit may also be
used as a stand-alone shop heater
As a
Secondary (Add-On) Furnace
—the unit aids an existing gas/electric furnace helping cut down on operation time.
It is recommended that only a authorized technician install your Multi-Fuel Furnace, preferably an NFI certified specialist.
Ì
Ì
Ì
Ì
Ì
Installation
IMPROPER INSTALLATION:
The manufacturer will not be held responsible for damage caused by the mal-
function of a furnace due to improper venting or installation. Call (800) 750-2723 and/or consult a professional
installer if you have any questions.
FLOOR PROTECTION
This unit must be installed on a non-combustible floor surface. If a floor pad is used, it should be UL listed or equal. The
floor pad or non-combustible surface should be large enough to extend a minimum of 6-inches in front, 6-inches on each
side, and 1-inch behind the furnace for horizontal termination.
Floor protection must extend under and 2-inches to each side of the chimney tee for an interior vertical termination.
A Floor Protector of 1 inch thick is recommended for this installation.
ADDITIONAL ITEMS NEEDED FOR INSTALLATION
• UL listed 3 inch or 4 inch (Depending on application) “PL” pellet venting exhaust system.
• Air distribution duct work. Transition from 4.5 inch x 18.5 inch rectangle to 10 inch round is provided.
• Air filter (Optional). Size: 10 x 20 x 1
• Floor Protection (If not installed on a non-combustible floor)
• Air return vent from the house to the room where furnace is installed.
• Fresh air for combustion if located in a small, tightly constructed room.
Содержание American Harvest 6100
Страница 17: ...USSC 17 Parts Diagram ...
Страница 19: ...USSC 19 Wiring Diagram ...
Страница 22: ...22 USSC Notes ...
Страница 23: ...USSC 23 Notes ...