A L L P U R P O S E V I N Y L S T O R A G E S H E D S
A Product of
U S P
US POLYMERS INC
Instructions for Assembly
Size 4’ x 8’
Foundation Kit
TM
TOOLS YOU WILL NEED
• Cordless Drill - Philips Head
Страница 1: ...A L L P U R P O S E V I N Y L S T O R A G E S H E D S A Product of USP US POLYMERS INC USP Instructions for Assembly Size 4 x 8 Foundation Kit TM TOOLS YOU WILL NEED Cordless Drill Philips Head...
Страница 2: ...be as shown Note Channel Position F04C FRONT SIDE F05C F04C F05C F01C F01C U CHANNEL Note Check all parts prior to installation CODE DESCRIPTION QTY F01C FOUNDATION U CHANNEL 6 F02C FOUNDATION U CHAN...
Страница 3: ...erfect frame See Fig 2 F03 F03 F03 F03 4 Fix the channel F01C into the main frame as shown See Fig Make sure while assembling the channel position should be as shown Note F01C 5 Fix the channel F02C i...
Страница 4: ...assembly of shed place exterior grade CDX 3 4 19mm plywood inside the foundation See fig F01C F05C B21 F04C FRONT SIDE OR 7b After completing the assembly of the base U channel fill the concrete upto...