background image

 

9/1/2013 

   AWNING / PATIO COVER 

INSTALLATION INSTRUCTIONS 

 
 
 

 

 

Before You Begin 

Read the installation instructions thoroughly before beginning the installation procedure. 

Perspective  

In  the  Awning  Instructions,  “Back”  means  toward  the  home,  “Front”  means  away  from  the  home, 
“Right”  means  the  right  side  when  facing  the  home,  and  “Left”  means  the  left  side  when  facing  the 
home. 
 
In general, we will begin assembling the Awning from the right to the left. The normal slope per foot of 
projection  for  the  Awning  is  1-1/2”  or  greater.  The  minimum  slope  is  1-1/3”  per  foot  of  projection. 
Anything less than 1-1/3” may cause water to flow toward the home. Clearance above a door should 
be a minimum of 6” to assure that the Awning will not interfere with the opening of the door. 
 

Tools Needed 

Drill, 1/8” and 5/32” Drill Bits, 1/4” Masonry Bit, 5/16” and 1/4” Nut Drivers, Level, Hack Saw, Shears, 
Vise Grip or Clamp. 
 

Содержание Arched

Страница 1: ...de when facing the home In general we will begin assembling the Awning from the right to the left The normal slope per foot of projection for the Awning is 1 1 2 or greater The minimum slope is 1 1 3 per foot of projection Anything less than 1 1 3 may cause water to flow toward the home Clearance above a door should be a minimum of 6 to assure that the Awning will not interfere with the opening of...

Страница 2: ... Awning the Support Channel is to be located Measure that distance on the drilling template and drill a 5 32 hole on the scored line The minimum set back is 6 and the maximum is 16 Place the drilling template on the end of the panel with the clip end pointing downward and slide it flush against the inside of the panel rib on the right side The predrilled hole closest to the clip end of the templat...

Страница 3: ...Secure with 10 x 1 2 TEK Screws through the front and back of the Support Channel and into the small section of the Post Space the remaining posts equally between the end posts and secure to the Support Channel If a post is spaced where a Support Channel Joiner is located the post must be moved right or left to be installed Step 5 Awning Panel Assembly All Awning Panels are alike Stand up the Supp...

Страница 4: ...e splash block into the Mounting Rail between the two ribs on the first Awning Panel The splash blocks have a tight secure fit and by tilting them forward while inserting will ease the process Install the remaining Awning Panels and splash blocks in the same fashion by aligning the pre punched holes in the Mounting Rail with the Awning Panel ribs The last Awning Panel should be secure just as the ...

Страница 5: ... Continue to drive the pin anchor until the second hole is at proper height for mounting posts Drive the locking pin through the anchor until it is flush with the ground Scroll Post Attach the base of the scroll post to the concrete with a 1 4 x 5 8 anchor and nut Step 7 Gutter Secure the gutter to the end of the panels with 10 x hex head screws every 6 Attach the gutter strap to the gutter and se...

Страница 6: ...Gutter with 8 x 3 4 Screws Attach the Trim Brace to the inside of the rib in the Valance with 8 x 3 4 Screws Run the screw through the valance and into the Brace for a strong hold Align the Valance vertically and drill through the top hole in the Trim Brace up through the Awning Panel Secure top of Trim Brace with 10 x 3 4 Screws installed through the Awning Panel into the Trim Brace Install Awnin...

Страница 7: ...sired location and then cut a hole within the area outlined by the Downspout Adapter Three Downspout Elbows are provided to allow the downspouts to be set back and to provide a kick out at the bottom The 7 downspout may be cut if the set back distance is greater than the distance of the two elbows Secure each section with 8 x 3 4 screws Each downspout section should be secured with the downspout s...

Отзывы: