A
s
s
e
m
b
ly
I
n
s
tr
u
c
ti
o
n
s
R
o
u
n
d
-T
o
p
W
a
lk
-I
n
C
o
o
p
V
-M
J
u
ly
2
0
1
9
C
o
p
y
ri
g
h
t
®
U
rb
a
n
C
o
o
p
C
o
m
p
a
n
y
a
ll
r
ig
h
ts
r
e
s
e
rv
e
d
.
S
te
p
1
B
-
L
o
w
e
r
R
u
n
R
o
o
s
t
W
a
ll
Page
21
Flush Tops
Back
Front
Bottom Edge
C1L Lines Up
To Seam Between
D Panels, about
25 inches up
from bottom
Open Doors To Access
Screw Holes.
Swing Inward
3
6
C4
C5
C2-L
C2-R
C1-L
C1-R
2
5
4
1
Wire
In
A2R
Same On
Front And
Back
7
Using provided level
check what you have built
so far on all side and adjust
soil and contact points as needed.
No D-Wall If You
Have Double
Door Option.