background image

1of2

Tools

 

Required:

 

Flathead

 

screwdriver,

 

Phillips

 

screwdriver,

 

pliers,

 

wire

 

cutters,

 

wire

 

strippers,

 

electrical

 

tape,

 

safety

 

glasses.

Light

 

Source:

 

LED

 

16W

Estimated

 

Assembly

 

Time:

 

20-30

 

minutes

Preparation:

 

Identify

 

and

 

inspect

 

all

 

parts

 

before

 

beginning

 

installation.

 

Check

 

package

 

content

 

list

 

and

 

diagrams

 

below

 

to

 

be

 

sure

 

all

 

parts

 

are

 

present.

 

If

 

any

 

parts

 

are

 

missing

 

or

 

damaged,

 

do

 

not

 

attempt

 

to

 

assemble,

 

install,

 

or

 

operate

 

the

 

fixture.

 

Contact

 

customer

 

service

 

for

 

replacement

 

parts.

Warnings and Cautions

Turn off electricity at circuit breaker or main fuse box before installation. Consult a licensed electrician if in doubt.

These instructions are provided for your safety. It is very important you read them completely before installing the fixture. We strongly
recommend that a licensed, professional electrician perform the installation.

Disconnect fixture from power source before replacing bulbs. Make sure bulbs are given sufficient time to cool before removal. Do not subject
glass parts to any shock while in operation or shattering may result.

Package Contents

Fixture Body

x 1

B

STEP 1

Drill Pilot Holes on Post

-

A. Carefully fit the Post Fitter over the

end of the Post (not supplied),
making sure the Post Fitter is fully
seated.

B. Mark the drill point for the (3)

Mounting Screws, using (3)
Mounting Holes as reference. After
marking hole locations, remove
fixture from post and drill 1/16” pilot
holes for screws.

Post

Post Fitter

Figure 1

Mounting Hole

STEP 2 - Wire Connections

A. Use standard wire connectors (not included) to make all wire

connections. (Connectors are not included with fixture.) Twist
connectors until wires are tightly joined together. Wrap each
connection with approved electrical tape and carefully stuff all the
connected wires into the Outlet Box.

White wire

from supply

White wire
from fixture

Black wire from
supply (or Red)

Black wire
from fixture

Ground wire

from supply

Ground wire
from fixture

Figure 2

A

Mounting
Screw
x 3

STEP 3

-

Attach Fixture Body to Post

A. Coat the top 1” of the Post with Clear Silicone Caulk (not supplied)

and position the Post Fitter onto the Post. Be sure to seat it

Post

Post Fitter

Figure 3

Mounting Hole

HOW TO REPLACE GLASS PANELS

Allen Screw

Screw

Fixture
Hood

Glass
Holder

Glass
Panel

Cage

A.

Fixture Hood and

remove the Fixture
Hood from the Cage.

B. Separate Quick

Connector and then
unscrew Screws from
the Cage and remove
LED Module and Heat
Sink, the Glass Holder.
Replace Glass Panels
from the Cage and then
re-install the Glass
Holder, LED Module
and Heat Sink. Secure
with removed Lock
Screws.

C. Connect Quick

Connectors. Attach the
Fixture Hood back onto
the Cage and secure
with Allen Screws.

Unlock Allen Screws on
the

Figure 4

(Step 3 Continued)

completely, aligning the holes in
the Fitter with the 1/16” Pilot Holes
drilled into the Post.

B. Secure the Fixture to Post with (3)

Mounting Screws (A).

Your fixture is now assembled
and ready to use. Enjoy!

LED Module
and Heat Sink

Male Quick
Connector

Female Quick
Connector

Installation Instructions:

 

UQL

12

54

www.urbanambiance.com

Отзывы: