background image

01

PACKAGE CONTENT

AInside the package you will find:

1. The machine  FAST 01 2C 
2. 2 charged fog fluid cylinders of 600 ml each.
3. A window sticker in order to indicate that the device is installed
4. Installation and use manual. 

01

 

Package 

contents 

      

page  2

02

 

Product 

presentation 

     

page  3

03

 

Conditions of use and  warnings 

 

 

 

 

page  3

04

 

Installations tips to install fogging systems 

 

 

 

page  4

05

 

How to activate the system  

 

 

 

 

page  5

06

 

Technical 

specifications 

     

page  6

07

 

Mains 

power 

      

page  7

08

 

Alcaline 

batteries 

      

page  7

09

 

Description and input and output connections  

 

 

page  8

10

 

Front 

LEDs 

      

page  9

11

 

Shooting 

time 

setting 

     

page 10

12

 

Connection 

example 

     

page 11

13

 

nstallation and cylinders exchange   

 

 

 

page 13

14

 

Maintenance 

      

page 14

15

 

Faults and possible solutions 

 

 

 

 

page 15

16

 

Reset 

from 

fault 

condition 

     

page 17 

 

17

 

Warranty 

       

page 18

18

 

Maintenance 

and 

operations     

page 19

The conditions of use will be automatically  accepted by breaking the security labels on the product.

SUMMARY

WARNING!

All UR FOG fogging systems should only be used with UR FOG-branded fluids. 

It is strictly forbidden to use any fluid not previously authorized in writing by UR FOG srl.

2

Содержание FAST 01 2C

Страница 1: ...FAST FAST 01 2C INSTALLATION AND USE MANUAL Installation and use manual model FAST 01 110 230 V rev 22 08 2021 Page 1 of 20 ENGLISH MANUAL ...

Страница 2: ... page 7 08 Alcaline batteries page 7 09 Description and input and output connections page 8 10 Front LEDs page 9 11 Shooting time setting page 10 12 Connection example page 11 13 nstallation and cylinders exchange page 13 14 Maintenance page 14 15 Faults and possible solutions page 15 16 Reset from fault condition page 17 17 Warranty page 18 18 Maintenance and operations page 19 The conditions of ...

Страница 3: ...not guaranteed by the manufacturer the use of UR Fog system in the presence of objects that may be damaged anyway by the contact with substances based on glycol water and alcohol Any employee or worker that may be exposed to fog must be warned in advance and must be checked for any allergy to the substances listed above At the date of printing of this manual it has never been pointed out any probl...

Страница 4: ...nds from the point where the machine is installed 14 Setting the shooting time interval between the minimum and maximum shown in the shooting table avoid overshooting even if the produced fog is dry and generally doesn t leave residue A shot that goes far beyond the recommended seconds can create a residue problems in the room 15 UR Fog continues to be effective for up to 2 hours and 30 minutes wi...

Страница 5: ...prevent a possible overheating In case of installation at the ceiling it is recommended to use the specific optional bracket In case of installation on a wall it s possible to ask for a 7 cm nozzle extension After removing the machine from the package unscrew the screws that stop the right side panel and remove it Pay attention to the screw below on the left as it s longer than the others unscrew ...

Страница 6: ...2 X 300 w 540 W about 2 5 hours 60 W 500 mA while shooting 60 mA in stand by 12 months with 10 shots Tamper screw Accelerometer Industrial standard as from other manufacturers FAST 01 2C Loosened ferrule can cause dropping Do not disconnect the machine immediately after the shot Change batteries every year Change the cylinder as soon as the empty signal appears WARNING The empty signal does not me...

Страница 7: ...leted the installation It is necessary to connect the ground terminal The machine has to be connected to the power supply through a disconnecting device that has to brake both connections and must be thermo magnetic switch IF YOU NEED TO REPLACE THE FUSE USE THE ONE WITH EXACTLY SAME SPECIFICATIONS IF YOU HAVE DOUBTS ASK TO YOUR AUTHORIZED DEALER 1 Phase 220V 110V 2 Neutral 220V 110V 3 Ground conn...

Страница 8: ...the battery case plug or cable interrupted Any anomaly of the batteries also causes the activation of fault output useful to remotely signal a possible anomaly When discharged batteries are removed from battery case the buzzer will sound a sequence of 10 bips per minute After re inserting the batteries it is suggested to wait at least for one minute in order to verify that the sequence of beeps is...

Страница 9: ...ou to clearly see the direction and keep it in place while tightening To screw and unscrew the nozzle you should use a pair of pliers in good condition to avoid damaging the plating Do not overscrew the nozzle it is sufficient that the Teflon nozzle does not move Do not flow directly on objects or walls less than 2 meters away or to the floor if it is installed at a height lower than 2 50 meters D...

Страница 10: ...PCB you must put the jumper P3 in setting position Then holding down the S1 SET 3 LEDs on the front will start flashing and each flash is equivalent to one second If you press the button again the shooting time is not added to the one previously set but will restart from zero N B The button in the cylinders compartment showed in next paragraph is linked to Set Reset button Therefore after setting ...

Страница 11: ...all manufacturers of Fog Cannons the number of shooting seconds must be reduced by half The diagrams and examples below are intended to provide only for a better understanding of the operation of the inputs outputs None of the diagrams below represents the single scheme to perform as in respect of the reference standard there are specific indications and only using all inputs and outputs on the PC...

Страница 12: ...UR Fog S r l Via Toscana 38 10099 San Mauro T se Torino Italy N B Ask for the PDF module writing to support urfog com ...

Отзывы: