1
. Park the unit in an appropriate location at the workplace.
2.
Apply the handbrake on the trailer and remove from the towing vehicle.
SETTING UP
Take EXTREME care NOT to ground either the Basket, or the
Jockey Wheel during the next step.
!
Do not attempt to set up the machine on steep slopes, ramps or
soft ground.
4.
Lower the Outriggers two at a time starting at the tow bar end (No’s 3&4) until
the jockey wheel just clears the ground.
5.
Lower Outriggers 1&2 until the green LED display indicates that they are
under load.
(Fig 4)
6.
Repeat this sequence for Outriggers 3&4.
3.
Manual Outriggers Only: Pull out the outrigger arms and allow the spring bolts to
lock thestabilisers into position.
Winddownthe screw jacks and level the machineusing the level gauge mounted on
the front of the chassis as a guide.
12
7.
By alternating from 1&2 to
3&4, carefully inch down
each pair of Outriggers
until all four Outriggers
are fully deployed, and the
wheels are well clear of the
ground.
8.
Now, by using the Level
indicator
(Fig.4),
raise
opposite Outriggers until
the bubble and indicator
ring are concentric (
i.e.,
the bubble rests in the
centre).
The unit is designed to operate on a supporting surface of
minimum bearing strength of 50N/cm
2
.
The maximum outrigger load is 10.3kN.
Fig. 4
9.
Check that each LED on the Ground Control panel is still illuminated. This in-
dicates that each foot is in firm contact with the supporting surface.
MANUAL OUTRIGGERS.
Ensure BOTH spring bolts on each Outrigger arm are fully
located.
!
Bubble
Indicator
Level indicator
Содержание POWERED ACCESS TL34
Страница 2: ......
Страница 4: ......
Страница 5: ......
Страница 20: ...FIG 5 14 SETTING UP MOTOR RUN HYDRAULIC VALVE LEVERS LEVEL BUBBLE Hydraulic Outriggers ...
Страница 33: ......
Страница 49: ...MAINTENANCE PROCEDURE Page 15 ...
Страница 50: ...MAINTENANCE PROCEDURE Page 16 ...
Страница 78: ...Page 44 ...