Steel Body, Automatic Wood Pellet Feed Hot Water Boiler Operation and Maintenance 
Manual 

INFORMATION ON COMBUSTION 

 

If the flue gas temperature is above the acceptable values, more energy will be exhausted from the 

flue into the atmosphere. The material, construction and connection of the chimneys are important in 

terms of high combustion efficiency, low heating costs and environmental protection. 

The  chimney  must  also  be  good  for  good  combustion.  High  temperature  resistant  fire  bricks  and 

stainless steel chimneys are recommended as materials. Horizontal 

smoke ducts should be connected to the chimney with a slope of at 

least  5%  and  the  length  should  not  exceed  1/4  of  the  chimney 

height. The height of the chimney should be determined well and 

the chimney rising from inside the building should rise up to 80 cm 

from the ridge. Chimney sections should be circular unless required. 

Never use perforated bricks in the chimney walls. Ideally, it is built 

with fire bricks. 

ÜNMAK Ecopel type boilers should be connected to an independent chimney which can provide 

minimum desired minimum draft. It should be measured in 20 Pa with a manometer. The part of the 

waste gas line between the boiler and the chimney should be insulated with glass wool. The flue gas 

pipe and the flue must be made of sheet steel or of at least 300 °C resistant material. For better 

combustion and efficiency, all connections on the flue gas pipe must be sealed. The flue gas pipe 

must be connected to the flue as soon as possible within the dimensions given in the above diagram. 

Horizontal connections and equipment such as the elbow that reduces traction should be avoided. 

 

A vertical single steel pipe should not be used 

as a chimney, the chimney must have an inner 

and an outer surface. The outer surface may be 

steel  or  brick  braided.  Corrosion  resistant 

stainless steel may be preferred for the inner 

surface  of  the  chimney.  In  order  to  prevent 

condensation,  thermal  insulation  should  be 

applied to the gap between the inner and outer 

surface of the chimney. 

 

At the lowest level of the chimney, there shall be a cleaning cap of any sealed steel. 

The length of the flue gas pipe between the flue and the boiler must not exceed one quarter of the 

flue height. 

Содержание Ecopel

Страница 1: ...el Compact Pellet Boiler Installation and User Manual NL SOY Yap Malzemeleri Sanayi ve Ticaret Ltd ti Pancar Organize Sanayi B lgesi 2 Etap No 2 Torbal ZM R Tel 444 35 32 Faks 0232 469 2412 www unmak...

Страница 2: ...RANSPORTATION 5 INSTALLATION LOCATION SELECTION 6 SAFETY WARNINGS 8 ELECTRICAL INSTALLATION INSTRUCTIONS 10 INFORMATION ON COMBUSTION 11 BOILER SPECIFICATIONS 13 RULES FOR HEATING INSTALLATION 15 CONT...

Страница 3: ...Operation and Maintenance Manual This booklet is covers below models ECOPEL 24 36 48 For Initial Start up Warranty Start up and Failure Notices please contact your local Authorized Service Centre or C...

Страница 4: ...for burning wood pellets only 6 8 10 mm diameter wood pellets are suitable for burning These boilers are only used for heating the heating system they are not suitable for direct domestic water heatin...

Страница 5: ...ATTENTION A hazardous situation may occur and failure to follow the precautions could result in minor personal injury or property damage WARNING Trapping of hands and feet should be avoided during tra...

Страница 6: ...he product must be of sufficient capacity In order to prevent damage to boiler outer plates and boiler during transportation help from the transport equipment such as forklift or pallet truck The cent...

Страница 7: ...hting is provided a system should be installed that does not dazzle but illuminates the apartment thoroughly The main switch and panels of the boiler room shall be placed around the entrance door and...

Страница 8: ...unker and to work comfortably A At least 80 cm to allow convenient use of the boiler cleaning arm and service intervention B The burner assembly is at least 100 cm C At least 80 cm in order to make fl...

Страница 9: ...ed from inside and outside and the cylindrical pipe is inserted into the rectangular chimney Fresh air must be provided to the area where the boiler is installed The dimensions specified in this manua...

Страница 10: ...nd therefore permanent damage Water should not be drained in the installation unless it is for maintenance or risk of freezing The system design should ensure that the ratio between the installation w...

Страница 11: ...rol cabinet must be connected to a wall panel with suitable grounding equipment All electrical connections must be made by authorized personnel in accordance with local regulations For each boiler roo...

Страница 12: ...nnected to an independent chimney which can provide minimum desired minimum draft It should be measured in 20 Pa with a manometer The part of the waste gas line between the boiler and the chimney shou...

Страница 13: ...bove the tiled roofs Chimney without chimney hood and chimney hood Incorrectly installed chimney and correctly installed chimney and chimney head DANGER Inadequate flue gas system can cause serious in...

Страница 14: ...Maximum Operating Temperature C Heating Line Flow Return inch 1 Filling Discharging Line inch Electricty V AC Hz Width W mm 960 960 1020 Depth D mm 700 700 700 Height H mm 1115 1230 1415 Height of Flo...

Страница 15: ...allowed to reach this group Manometer can be seen when the left front door of the boiler is opened Water pressure can be observed from the manometer while adding water When the left front door of the...

Страница 16: ...culation pump expansion tank safety valve is included with the boiler and you do not need to add to the installation separately The wiring diagram can be simply installed as shown For installations wi...

Страница 17: ...lower connection point Pressure reducer safety valve and expansion tank must be installed in the city water line entering the boiler Systems to be installed with Double Serpentine Hot Water Storage T...

Страница 18: ...e heating installation including installation pipes and radiators must be protected against corrosion Oxygen in the installation water causes rust and consequently material loss as a result of oxidati...

Страница 19: ...tion only when the installation is cold Considerations for central heating connected to old installations In a heating system that is used for a long time a protective layer black magnetite is formed...

Страница 20: ...hen the enter button is pressed in the menu it accepts the value written on the screen or enters into the menu displayed on the screen Escape Button Escape button is used to cancel without saving the...

Страница 21: ...rbox standby time 0 0 2000 sec P1 3 Fan speed 600 3000 rpm P1 4 Transition time 0 600 sec Power 2 P2 1 Gearbox feeding time 1 0 40 0 sec P2 2 Gearbox standby time 0 0 2000 sec P2 3 Fan speed 600 3000...

Страница 22: ...wn temperature 0 100 C V4 3 Pump run time at temperature rise 0 255 sec V4 4 Pump standby time at temperature rise 0 255 sec V4 7 Shut down time at power 0 sleep mode 0 20 min 0 cancel Various Setting...

Страница 23: ...empty there may not be an ignition at first After the error message appears on the screen reset it by pressing the ESC button for 5 seconds After the firing phases have passed the boiler goes to power...

Страница 24: ...it must be repaired and sealed Check the fan for proper operation An improperly balanced balanced fan makes periodic noises If there is fuel dust or ashes collected between the vanes of the fan it is...

Страница 25: ...he A1 bolts and remove the fan Then taking the A2 bolts gently remove the fan throat so that it does not hit the igniter You can remove the igniter by loosening the small setscrew bolt in the round ig...

Страница 26: ...r covers Cover wicks may be worn Covers may be deformed Replace the wicks Make sure that the combustion does not stand on the covers For deformed covers seek assistance from a specialist garage Failur...

Отзывы: