CHAPTER 4: CONTROLS
MODEL HF2 2 kHz HIGH FREQUENCY RESISTANCE WELDING POWER SUPPLY
4-8
990-057
5
Connect a reed relay, or the open collector of an opto coupler to the Control Signals connector
to initiate the selection process. The emitter of the opto coupler must be connected to Pin 11.
Keep the selected input closed to maintain the selection.
Control Signals - Pin Assignments
Pin No.
I/O
Description
1
Input
PLC input: Remote Weld Schedule Selection, Control Line 20
Chain control box (CCB) input: Schedule Down (decrement number)
2
Input
PLC input: Remote Weld Schedule Selection, Control Line 21
CCB input: Schedule Up (increment number)
3
Input
PLC input: Remote Weld Schedule Selection, Control Line 22
CCB input: Reset (set schedule # to power up schedule #)
4
Input
PLC input: Remote Weld Schedule Selection, Control Line 23
CCB input: Auto/Manual (enable/disable chain function)
5
Input
Remote Weld Schedule Selection, Control Line 25
6
Out-put
Relay K2, + 5-50 VDC (User must supply power)
7 NC
8
Out-put
Relay K1, 24-115 VAC (User must supply power)
9 Input Process
Inhibit
10 Input Emergency
Stop
11 Input Circuit
Ground
12
Input
Remote Weld Schedule Selection, Control Line 24
13
Out-put
Relay K2, + 5-50 VDC Return
14
Input
Remote Weld Schedule Selection, Control Line 26
15
Out-put
Relay K1, 24-115 VAC Return