Start-up
To start up the VAV Zone Controller, you need one of the following user interfaces. These items let you access the
controller information, read sensor values, and test the controller.
This interface...
Provides a...
i-Vu Open
application
Permanent interface
Field Assistant
application
runs on a laptop connected to controller's Local Access port
1
Temporary interface
Virtual BACview
application
runs on a laptop connected to controller's Local Access port
1, 2
Temporary interface
BACview6 Handheld
keypad/display device
connects to controller's Local Access port
1, 2
Temporary interface
BACview6
keypad/display device
connected to controller's Rnet port
2
Permanent interface
1
Requires a USB Link (USB-L).
2
See the
BACview Installation and User Guide
for instructions on connecting and using the above items.
Configuring the VAV Zone Controller's properties
To start up the VAV Zone Controller, you must configure certain points and properties.
Appendix A
(page 51) is a
complete list of all the points and properties, with descriptions, defaults, and ranges. These properties affect the
unit operation and/or control. Review and understand the meaning and purpose of each property before changing
it.
•
Unit Configuration properties
(page 52)
•
Setpoint Configuration properties
(page 61)
•
Service Configuration properties
(page 61)
•
Linkage properties
(page 68)
See
Appendix A
(page 51) for a complete list of the controller's points/properties.
NOTE
Engineering units shown in this document in the defaults and ranges are strictly for reference. You must
enter an integer only.
Performing system checkout
1
Verify that all power and communication connections are correct and tight.
2
Verify that all zone terminals, ductwork, and zone controllers are properly installed and set according to
installation instructions and job requirements.
3
Verify that all air duct connections are tight.
Start-up
VAV Zone Controllers
35