■
26
│
GB│IE
UAVS 300 A1
Clearing a material blockage
♦
Move the
REV/OFF/AUTO/FWD
switch
8
to the
REV
("reverse") position
if the material being shredded causes a jam . The appliance now goes into
reverse and the material is ejected .
♦
Alternatively, move the
REV/OFF/AUTO/FWD
switch
8
to the
FWD
("forward") position if the material causes a blockage . The appliance is now
in forwards operation and the material that is being shredded is pulled in
again .
♦
Move the
REV/OFF/AUTO/FWD
switch
8
to the
OFF
position as soon as
the jammed material has been ejected .
Turning the appliance off
NOTE
►
We recommend that you switch off the appliance and let it cool down for
about 30 minutes after 3 minutes of operation to prevent overheating .
♦
Switch the appliance off by moving the
REV/OFF/AUTO/FWD
switch
8
to
the
OFF
position . The
power
lamp
6
goes out .
Overheating protection
This appliance is fitted with overheating protection . If the motor overheats due to
overloading, the appliance switches itself off automatically . The
overheat
lamp
7
lights up permanently red until the motor has cooled down sufficiently .
If this occurs, do the following:
WARNING! – RISK OF INJURY!
►
Pull the power plug out of the power socket to prevent unintended starting
of the appliance .
♦
Switch the appliance off by moving the
REV/OFF/AUTO/FWD
switch
8
to
the middle
OFF
position .
♦
Empty the waste collectors
w
/
e
.
♦
Allow the appliance to cool down for about 30 minutes .
♦
Replace the plug in the mains power socket .
♦
Switch the appliance on by moving the
REV/OFF/AUTO/FWD
switch
8
to the
AUTO
position . The
overheat
lamp
7
no longer lights up once the
appliance has cooled down sufficiently .
Содержание 314014
Страница 3: ...power overheat...
Страница 19: ...16 DE AT CH UAVS 300 A1...
Страница 35: ...32 GB IE UAVS 300 A1...
Страница 51: ...48 FR BE UAVS 300 A1...
Страница 67: ...64 NL BE UAVS 300 A1...
Страница 83: ...80 PL UAVS 300 A1...
Страница 99: ...96 CZ UAVS 300 A1...
Страница 115: ...112 SK UAVS 300 A1...