background image

EVERYTHING YOU NEED FOR A QUICK, PROFESSIONAL INSTALLATION

F O R   Q U E S T I O N S   O R   C U S T O M E R   S E R V I C E   V I S I T   U N I R A C . C O M   O R   C A L L   ( 5 0 5 )   2 4 8 - 2 7 0 2

  

|

 

CONDUIT 

MOUNT

INSTALLATION GUIDE

At desired location, use a flat bar or shingle tool to loosen the shingles that the 
flashing will slide under. Backfill each pilot hole with roofing sealant, and apply 
a U-shaped bead of roof sealant with the open side pointing downslope onto the 
flashing. Then slide the flashing into place under the shingle course, aligning 
the flashing hole. Pilot holes are not required when installing directly to the 
roof deck. When installing into a rafter, be sure to drill a 3/16” pilot hole.

STEP 1: INSTALL 

FLASHING

STEP 1

LOOSEN SHINGLES

APPLY SEALANT

PLACE FLASHING

Place 

Conduit

 Mount onto flashing so that the pre-installed EPDM grommet properly seats 

against the raised hole in the flashing. Once the 

Conduit

 Mount is in place, insert the included 

5/16” x 2” lag screw through the mount and flashing into the pilot hole (if applicable), and 
tighten until the EPDM in the sealing washer bulges. Be sure not to over tighten. 

STEP 2: INSTALL 

CONDUIT

 MOUNT

STEP 2

Once

 Conduit

 Mount is installed on the roof, lay conduit into the 

Conduit 

Mount, 

then snap the cap into place, securing the conduit. Snap the cap into the first notch 
for 1” conduit and the second notch for 3/4” conduit.

TIPS:

RAIL MOUNTING:

 

Conduit

 Mounts can also be installed in the 

Solar

mount rail slot 

by using a 3/8” x 3/4” T-Bolt (sold separately) inserted through the 

conduit 

mount 

and secured when nut is tightened. 

CAP REMOVAL: 

Cap can be removed from conduit by inserting a flat head screw 

driver into slot in the cap, and prying gently until cap clears notch in the base.

STEP 3: INSTALL

 CONDUIT

STEP 3

RAIL MOUNTING

CAP REMOVAL

Отзывы: