EVERYTHING YOU NEED FOR A QUICK, PROFESSIONAL INSTALLATION
F O R Q U E S T I O N S O R C U S T O M E R S E R V I C E V I S I T U N I R A C . C O M O R C A L L ( 5 0 5 ) 2 4 8 - 2 7 0 2
|
CONDUIT
MOUNT
INSTALLATION GUIDE
At desired location, use a flat bar or shingle tool to loosen the shingles that the
flashing will slide under. Backfill each pilot hole with roofing sealant, and apply
a U-shaped bead of roof sealant with the open side pointing downslope onto the
flashing. Then slide the flashing into place under the shingle course, aligning
the flashing hole. Pilot holes are not required when installing directly to the
roof deck. When installing into a rafter, be sure to drill a 3/16” pilot hole.
STEP 1: INSTALL
FLASHING
STEP 1
LOOSEN SHINGLES
APPLY SEALANT
PLACE FLASHING
Place
Conduit
Mount onto flashing so that the pre-installed EPDM grommet properly seats
against the raised hole in the flashing. Once the
Conduit
Mount is in place, insert the included
5/16” x 2” lag screw through the mount and flashing into the pilot hole (if applicable), and
tighten until the EPDM in the sealing washer bulges. Be sure not to over tighten.
STEP 2: INSTALL
CONDUIT
MOUNT
STEP 2
Once
Conduit
Mount is installed on the roof, lay conduit into the
Conduit
Mount,
then snap the cap into place, securing the conduit. Snap the cap into the first notch
for 1” conduit and the second notch for 3/4” conduit.
TIPS:
RAIL MOUNTING:
Conduit
Mounts can also be installed in the
Solar
mount rail slot
by using a 3/8” x 3/4” T-Bolt (sold separately) inserted through the
conduit
mount
and secured when nut is tightened.
CAP REMOVAL:
Cap can be removed from conduit by inserting a flat head screw
driver into slot in the cap, and prying gently until cap clears notch in the base.
STEP 3: INSTALL
CONDUIT
STEP 3
RAIL MOUNTING
CAP REMOVAL