![Union INCA1021 Скачать руководство пользователя страница 19](http://html.mh-extra.com/html/union/inca1021/inca1021_translation-of-the-original-operating-instructions_842964019.webp)
19
5 Transport, setup and acceptance
NOTE
Generally, the process gas analyser is started up by UNION Instruments GmbH or
service technicians.
If it is not transported, set up and started up by Union Instruments GmbH (for
example in-house transportation and resale), coordinate the appropriate
procedure with UNION Instruments GmbH (
Chapter 12 Service).
5.1 Transport
WARNING
Possible injury from the process gas analyser tipping over or falling from pallets
and load carrying equipment.
•
At least two persons are required to unpack and transport the analyser (for
weight see technical data)!
•
Check the load bearing capacity and condition of the slinging equipment and
carefully attach it.
•
Never stand under suspended loads.
NOTE
In case of damage during transport from improper handling, the carrier should
perform a damage report within seven days (railway, post office, freight
forwarder).
Содержание INCA1021
Страница 1: ...Apr 2016 V1 10 Translation of the original operating instructions Process gas analyser INCA1021 ...
Страница 3: ...3 Dimensions ...
Страница 10: ...EU Declaration of Conformity 10 ...
Страница 16: ...Safety equipment 16 3 2 Markings and warnings Fig 3 1 Markings and warnings 1 Type plate 1 ...
Страница 44: ...Operation 44 ...
Страница 46: ...Decommissioning switching off 46 ...
Страница 50: ...Maintenance 50 ...
Страница 54: ...Service 54 ...
Страница 56: ...Associated documents 56 ...
Страница 58: ...Disposal 58 ...
Страница 60: ...Spare parts 60 ...
Страница 61: ...61 16 Annex ...
Страница 62: ...Annex 62 EU Declaration of Conformity Flame arrester ...
Страница 63: ...Annex 63 ...