background image

Un iv e r sal Cr an e  an d
Pe r son n e l Lif t

OPERATOR'S
MANUAL

Publication No. 4500360-1/0410

A PRODUCT OF:

Champ-UniLift
850 State Hwy 55
Brooten MN 56316

www.ChampUniLift.com

Courtesy of Crane.Market 

Содержание 538

Страница 1: ...Universal Crane and Personnel Lif t OPERATOR S MANUAL Publication No 4500360 1 0410 A PRODUCT OF Champ UniLift 850 State Hwy 55 Brooten MN 56316 www ChampUniLift com Courtesy of Crane Market ...

Страница 2: ...rstand the use of the Emergency Manual Lowering Valve and other emergency procedures I will not attempt to alter or disable any safety devices guards or interlocks I have been shown the location of the Operators Manual and was instructed to read the manual prior to operation I understand that the 538 UniLift is NOT INSULATED and shall not be used within 10 feet of any power lines I will wear the b...

Страница 3: ... electrical power cords are safely stored to prevent tangling or crushing 6 Always wear the proper body harness and keep the harness secured to the lanyard ring whenever operating the 538 UniLift from the bucket 7 DO NOT exceed the manufacturer s rated lifting capacities 8 The lower controls are for emergency use only when a worker is present in the bucket 9 It is PROHIBITED and DANGEROUS to use r...

Страница 4: ...E START INSPECTION 1 5 BUCKET LOCK 1 5 BUCKET OPERATION 1 5 CRANE OPERATION 1 6 SHUTDOWN 1 6 SYSTEM RECHARGING 1 7 EMERGENCY CONTROLS 1 7 Power ENABLE Switches 1 7 Station Override Switches 1 7 Emergency Stop Switches 1 7 EMERGENCY MANUAL LOWERING VALUE 1 7 EMERGENCY PROCEDURES 2 1 PLATFORM CONTROL STATION SWITCH FAILURE 2 1 LOWER CONTROL STATION SWITCH FAILURE 2 1 HYDRAULIC LINE FAILURE 2 1 POWER...

Страница 5: ...THIS PAGE LEFT INTENTIONALLY BLANK Courtesy of Crane Market ...

Страница 6: ...lowing basic components Figure i 1 UniLift With Personnel Bucket Attached ADJUSTABLE OUTRIGGERS Outriggers are used for absorption of tipping load during use and are manually set Adjustable for up to three feet the outriggers assure that the unit can be leveled and rest firmly on solid footing Electrical interlocks prevent lift crane operation until all four outriggers are fully extended and resti...

Страница 7: ...details on battery system HYDRAULIC LIFT AND TELESCOPING CYLINDERS Aerial lift is provided by a 3 single acting cylinder attached to the upper and lower booms Telescoping lift is provided by a 1 1 2 double acting cylinder located inside the upper boom telescoping boom assembly The telescoping boom will extend up to 9 feet allowing a side reach of approximately 24 feet Hydraulic power is provided b...

Страница 8: ...WITH ELECTRICAL WIRES Description Page i 3 UNIVERSAL CRANE Two 2 anchor points are provided for lifting loads up to 500 pounds with the personnel bucket removed The inner lanyard ring has a 500 pound load rating with the boom fully retracted The outer lanyard ring has a 300 pound crane load rating in any position See Figure i 2 Note The 500 pound load rating is ONLY during crane operation and ONLY...

Страница 9: ...THIS PAGE LEFT INTENTIONALLY BLANK Courtesy of Crane Market ...

Страница 10: ...mum Operating Pressure 1350 PSI 9 31 MPa At point where boom hook is 8 feet from center of rotation 500 lb 227 kg rating at full retraction only inner arc Figure i 2 Should be 1100 PSI 7 6 MPa on 534 Models Unit with Jack Type outriggers MINIMUM VEHICLE TIPPING LOAD HORIZONTALLY EXTENDED On level ground 1 1 2 x rated load 450 lbs 204 kg On 5E slope 1 1 3 x rated load 400 lbs 182 kg BUCKET TRAVEL B...

Страница 11: ...THIS PAGE LEFT INTENTIONALLY BLANK Courtesy of Crane Market ...

Страница 12: ...lbs Always connect the lights and safety chains and use safe towing practices The boom must be stored in the boom cradle when the trailer is in motion A tie down strap is provided for travel and will prevent excessive wear due to vibration and oscillation Also the bucket should be hinged up and locked into position For maximum safety limit the towing speed to 45 MPH or less PARKING Park the traile...

Страница 13: ...les on one outrigger then proceed to the next outrigger DO NOT OVER EXTEND ANY ONE OUTRIGGER OUTRIGGERS MUST BE LOWERED EVENLY AND IN SEQUENCE The unit must be level with the weight of the unit supported by all 4 outriggers Note When outriggers are set on a slope 5 maximum the outriggers on the downhill side will be extended further than those on the uphill side in order to level the lift 5 Contin...

Страница 14: ...ey are fully re engaged 4 Press the power jack switch UP until the front of the UniLift is above level This can be determined by watching the position of the tongue On the front outriggers disengage pin A and slide the horizontal outrigger out until it locks Grasp the front vertical outriggers disengage pin B and lower to the ground Disengage pin B lift up the horizontal outrigger until there are ...

Страница 15: ...4500360 1 1106 Page 1 2B Operation Power jack instructions Courtesy of Crane Market ...

Страница 16: ...Courtesy of Crane Market ...

Страница 17: ...THIS PAGE LEFT INTENTIONALLY BLANK Courtesy of Crane Market ...

Страница 18: ...e outrigger foot Crank all 4 outriggers evenly Raise the unit 2 3 holes on one outrigger then proceed to the next outrigger DO NOT OVER EXTEND ANY ONE OUTRIGGER OUTRIGGERS MUST BE LOWERED EVENLY AND IN SEQUENCE The unit must be level with the weight of the unit supported by all 4 outriggers Note When outriggers are set on a slope 5 maximum the outriggers on the downhill side will be extended furth...

Страница 19: ... control switches at the pedestal see Figure 1 5 The UPPER CONTROL LOWER CONTROL Switch handle must be held in the LOWER CONTROL position before the directional control switches are operable The switch marked UP and DOWN controls the up and down movement of the boom The switch marked OUT and IN controls the action of the upper telescoping section of the boom The switch marked CCW and CW controls t...

Страница 20: ...ol switch is released the actuator returns to the neutral position and movement stops M Movement will also stop when the DOWN OVERRIDE OFF ENABLE switch is released The DOWN OVERRIDE position serves as a means of lowering and retracting the boom in an emergency situation due to an electrical system malfunction or interlock concern Activating the switch to the DOWN OVERRIDE position allows operatio...

Страница 21: ... any boom function The LOWER function also does not require pump activation so it may be used in conjunction with the RETRACT and ROTATION controls as would be used in returning the boom to the stowed position from a working position To operate the machine from the Lower Control Station M Make sure the EMERGENCY STOP button is pulled out M Hold the PLATFORM LOWER CONTROL switch in the LOWER CONTRO...

Страница 22: ... and turn the key switch ON The green light on the Lower Control Station will be lit Raise the boom out of the boom rest and rotate away from the tongue using the lower controls Check to make sure that the bucket is properly installed Check the bucket yoke lock pins to insure it is positioned in the hole and the bucket yoke is securely locked to the boom IMPORTANT A body harness with a 4 ft lanyar...

Страница 23: ...boom and move it clear of the work area Loads of 500 pounds maximum can be lifted by the inner lanyard ring with the telescoping boom fully retracted Do not extend the boom when lifting over 300 lbs Loads of 300 pounds maximum can be lifted to approximately 31 feet high with a side reach of approximately 22 feet by using the outer lanyard ring See Figure i 2 Proper sequence of operation to lift ob...

Страница 24: ...ed or the Emergency Stop switch on the Platform Control Station controls is activated depress the override switch to LOWER CONTROL This will give the lower control station priority over the system Emergency Stop Switches Emergency Stop switches are located at both the Platform Control Station and the Lower Control Station See Figures 1 4 1 5 To shut off power to the system either Emergency Stop sw...

Страница 25: ...red function The red EMERGENCY STOP pushbutton must be twisted clockwise to reset and resume normal operation HYDRAULIC LINE FAILURE If partial failure is experienced and holding valves do not lock use the controls in short intervals to store the booms Should a complete line failure occur the holding valve will lock The failed line must be repaired to release the holding valve POWER FAILURE Standb...

Страница 26: ...ructions 1 Connect positive cable to positive post of discharged batteries 2 Connect other end of booster cable to positive post of booster battery 3 Connect second cable to negative post on booster battery 4 Make final connection on unit frame away from battery to prevent sparking 5 Remove cables in reverse order of installation Powered by TCPDF www tcpdf org Courtesy of Crane Market ...