C.I.B. UNIGAS
- M039241CB
20
Pilot burner assembly
The connection to the pilot must be done according to the following scheme
Fig. 10
Key
1
Gas valves
2
Gas pressure switch
3
Gas governor with filter
4
Bellows unit
5
Manual cutoff valve
6
Pressure governor
7
Tank
Gas supply:
LPG
The pilot gas train is already installed into the burner, the connection from the gas governor with filter to the gas supply network must
be carried out.
Once the gas train in installed, execute the electrical connections for all its items (gas valves group, pressure switch).
ATTENTION:
once the gas train is mounted according to the diagram on Fig. 10, the gas proving test must be performed,
according to the procedure set by the laws in force.
1
2
4
5
3
1
6
7
BURNER MANUFACTURER
INSTALLER
L.P.G.
connection to the gas
supply network
Содержание PBY70
Страница 7: ...C I B UNIGAS M039241CB 7 Overall dimensions mm boiler recommended drilling template ...
Страница 16: ...C I B UNIGAS M039241CB 16 HYDRAULIC DIAGRAMS Fig 8 Hydraulic diagram 3ID0024 ...
Страница 18: ...C I B UNIGAS M039241CB 18 Fig 9 Hydraulic diagram 3I2D 01 ...
Страница 23: ...C I B UNIGAS M039241CB 23 Hydraulic connections Key G Gas A Air O Oil CA Cleaning air Fig 12 G G O A CA A O CA ...
Страница 37: ...C I B UNIGAS M039241CB 37 ...
Страница 42: ......
Страница 43: ......