Unigas HTP90A Скачать руководство пользователя страница 40

C.I.B. UNIGAS - M039219CA

40

Inspection and replacement of the

 

MULTIBLOC DUNGS MBC..SE filter (Threaded valves group)

Removing the combustion head

1

Remove the top 

H

.

2

Remove the 

UV

 detector out of its housing: disconnect electrode cables and the light oil flexible hoses.

3

Loosen the screws 

V

 holding the gas manifold 

G

, loosen the two connectors 

E

 and remove the assembly as shown.

4

Clean the combustion head by means of a vacuum cleaner; scrape off the scale by means of a metallic brush.

Note:

 to replace the combustion head, reverse the operations described above.

Removing the oil gun, replacing the nozzle and the electrodes

To remove the oil gun, proceed as follows:

1

remove the combustion head as described on the prevoius paragraph;

2

loosen the 

VL

 screw and remove the oil gun and the electrodes: check the oil gun, replace it if necessary;

3

after removing the oil gun, unscrew the nozzle and replace it if necessary;

4

in order to replace the electrodes, unscrew the 

VE

 fixing screws and remove them: place the new electrodes being careful to

observe the measures showed on pag.: reassemlbe following the reversed procedure.

Caution

: adjust the nozzle position according to the air pipe, by means of the 

VU

 screw, ance the 

VL

 screw is fastened.

Inspect the filter at least once a year.

z

Change the filter, if pressure value between pressure connections 1 and 2 is grea-
ther than 10 mbar.

z

Change the filter, if pressure value between pressure connections 1 and 2 is twice
as high compared to the last inspection.

1. Interrupt gas supply: close ball valve

2. Remove screws 1-2

3. Replace the filter insert 3

4. Screw in screws 1-2 without use force to fasten.

5. Perform leakage and funcion test.

Space requirements for fitting filter, A: from 150 to 230 mm.

Fig. 40

ATTENTION: 

avoid

 

the electrodes to get in touch with metallic parts (blast tube, head, etc.), otherwise the boiler operation

would be compromised. Check the electrodes position after any intervention on the combustion head. 

E

V

H

G

V

G

VU

VL

VE

Содержание HTP90A

Страница 1: ...v 0 08 2008 BURNERS BRUCIATORI BRULERS BRENNER QUEMADORES Progressive and fully modulating gas light oil burners MANUAL OF INSTALLATION USE MAINTENANCE HTP90A HTP91A HTP92A HTP93A HTP512A HTP515A HTP5...

Страница 2: ...ing is the same as delivery mains electricity gas oil or other fuel z Observe caution with hot burner components These are usually near to the flame and the fuel pre heating system they become hot dur...

Страница 3: ...evelopment of toxic or explosive mixtures DIRECTIVES AND STANDARDS Gas burners European directives Directive 90 396 CEE Gas Appliances Directive 2006 95 EC on low voltage Directive 2004 108 CEE on ele...

Страница 4: ...ng parameters are needed z fuel z furnace input in kW or kcal h kW kcal h 860 z boiler type z combustione head type reverse flame or three phase z temperature or pressure of the thermal carrier fluid...

Страница 5: ...far as intercepitng the network pressure curve according to the installed gas train DN65 in the example From the inter ception point draw an horizontal line as far as matching on the y axis the value...

Страница 6: ...e switch 8 GAS CONNECTION 50 Rp2 65 DN65 80 DN80 100 DN100 BURNER TYPE HTP90A HTP91A HTP92A HTP93A Output min max kW 320 2300 480 2670 480 3050 550 4100 Fuel Natural gas Light oil Gas category see nex...

Страница 7: ...50Hz 400V 3N 50Hz Pump motor kW 1 1 1 5 1 5 4 Total power consumption kW 1 6 2 2 4 5 Protection IP40 Operation Progressive Fully modulating Gas train 50 Valves Connection 2 Rp 2 Gas train 65 Valves Co...

Страница 8: ...80 1356 490 866 305 1449 959 490 265 295 307 185 360 510 695 M14 424 300 610 300 592 148 444 750 322 875 228 180 HTP91A 100 1356 490 866 305 1539 1049 490 265 295 447 185 360 510 695 M14 424 300 610 3...

Страница 9: ...0 494 185 460 530 715 M14 552 390 693 390 x 643 x 160 483 843 293 945 312 230 HTP515A 80 1491 520 971 314 1583 1084 499 380 420 494 185 460 530 715 M14 552 390 693 390 x 695 x 160 535 875 322 945 312...

Страница 10: ...ltiply value in kW by 860 Data are referred to standard conditions 1013mbar 15 C HTP525A HTP520A HTP515A HTP512A HTP93A HTP92A HTP90A HTP91A 0 2000 4000 6000 8000 10000 12000 14000 16000 Campo di scel...

Страница 11: ...0 200 250 300 Rp 2 50 DN65 DN80 DN100 0 20 40 60 80 100 120 50 100 150 200 250 300 350 Rp2 50 DN100 DN80 DN65 0 40 80 120 160 200 50 100 150 200 250 300 350 400 450 500 Rp 2 50 DN65 DN80 DN100 0 50 10...

Страница 12: ...w rate the temperature the distance between the fan and the burner and according to the fan features as well Packing The burners are despatched in wooden crates Their dimensions are 9xA series 1740mm...

Страница 13: ...this case the blast tube must penetrate at least 50 100 mm into combustion chamber in respect to the tube bundle plate The length of the blast tubes does not always allow this requirement to be met a...

Страница 14: ...pressure governor pressure switch VPS504 gas proving system Gas train 4 Gas train with valves group VGD 20 40 with built in gas pressure governor PGCP gas leakage pressure switch Gas train 5 Rp2 Gas...

Страница 15: ...valve first fit the flanges to the piping and then clean the associated parts z install the valve z the direction of gas flow must be in accordance with the direction of the arrow on the valve body z...

Страница 16: ...nsert MBC SE Note position of O rings see Fig 9 3 Tighten screws A H 4 After installation perform leakage and functional test 5 Disassembly in reverse order Fig 9 Mounting 1 Insert setscrews A 2 Inser...

Страница 17: ...its elements gas valves group pressure switches gas proving system Hydraulic diagrams for light oil supplying circuits DUNGS MBC SE Siemens SKP actuator Performance range mbar 4 20 20 40 40 80 80 150...

Страница 18: ...stem The burner is supplied with filter and flexible hoses all the parts upstream the filter must be installed by the customer As far as the hoses connection see the related paragraph Key 1 Burner 2 F...

Страница 19: ...ecause the fuel unit will not function properly and damage to the pump and burner motor could result z Do not use fuel with additives to avoid the possible formation over time of compounds which may d...

Страница 20: ...2 5 450 cSt Oil temperature 10 160 C Max suction pressure 4 bar Min suction pressure 0 45 bar to avoid gasing Max return pressure 4 bar Rotation speed 3450 rpm max Viscosity 4 800 cSt Oil temperature...

Страница 21: ...motor thermal cutout Respect the basic safety rules make sure of the connection to the earthing system do not reverse the phase and neutral connections fit a differential thermal magnet switch adequa...

Страница 22: ...r as for the next elements Fig 19 Fig 21 LB Burner s lockout signalling LED LSPG Gas proving system lockout signalling LED 3 In case of modulating burners the 5 6 and 7 terminals on the MA teminal blo...

Страница 23: ...on the body In the event of wrong rotation reverse the three phase supply and check again the rotation of the motor NOTE except for motors with star delta start up burners are supplied for three phase...

Страница 24: ...2 Pressure outlet on the combustion chamber 3 Gas pressure outlet on the butterfly valve 4 Differential pressure gauge Measuring the gas pressure in the combustion head In order to measure the pressu...

Страница 25: ...230 250 0 5 10 15 20 25 30 35 40 40 60 80 100 120 140 160 180 200 220 240 260 280 300 0 5 10 15 20 25 30 35 40 45 40 60 80 100 120 140 160 180 200 220 240 260 280 300 320 340 0 5 10 15 20 25 30 35 40...

Страница 26: ...cam 5 Actuator VPS504 Gas proving system The VPS504 check the operation of the seal of the gas shut off valves This check is carried out as soon as the boiler thermostat gives a start signal to the bu...

Страница 27: ...as valves group set the pressure regulator to 1 3 of its stroke using a 2 5 allen key Now adjust the burner according to the actuator model provided The burner is factory set wih the adjusting plate h...

Страница 28: ...ly the flue gas analisys as to avoid combustion with little air dose the air according to the gas flow rate change following the steps quoted below 8 acting on the pressure stabiliser of the valves gr...

Страница 29: ...ostat series and wait until the pre purge time comes to an end and that the burner starts up 4 the burner starts up with the actuator on the ignition position set it to the MAN manual mode by the MAN...

Страница 30: ...the combustion values read 15 Once the cam foil shape is defined reconnect the TAB thermostat reconnecting the wire to the terminal no 6 or setting the RWF40 burner modulator to AUTO or the CMF switc...

Страница 31: ...t plastic cap z While the burner is operating at the maximum output test the gas pressure on the pressure port of the minimum gas pressure switch z Slowly close the manual cutoff valve placed upstream...

Страница 32: ...t paragraphs Fig 29 Example Bergonzo if a 220kg h flow rate BERGONZO nozzle is provided set the return pressure at 11bar supply at 20bar on the delivery to get a 220kg h flow rate If the return pressu...

Страница 33: ...conds until the oil circuit is charged 3 bleed the air from the M pressure gauge port Fig 31 by loosing the cap without removing it then release the contactor Fig 31 4 Before starting the burner up dr...

Страница 34: ...djusting screw that refers to a lower position screw V2 to increase the rate unscrew to decrease in order to get the pressure as showed on chart diagram on Adjusting light oil flow rate on page 32 acc...

Страница 35: ...move the adjusting cam in order to adjust each of the V2 screws as to describe the cam foil shape 11 to change the SV2 position set the actuator on the manual mode MAN turn the adjusting cam SV2 and...

Страница 36: ...he pump 1 to the nozzle 3 at the delivery pressure set by the pressure governor The solenoid valve 2 set the fuel immission into the combustion chamber The part of fuel that is not burnt goes back to...

Страница 37: ...rning the A switch on the burner control panel CAUTION if the fuel chosen is light oil be sure the cutoff valves on the feed and return pipes are open z Check the control box is not locked signalling...

Страница 38: ...control box drives the actuator opening and when the maximum opening position is reached the pre purge time counting starts z At the end of the pre purge time the actuator is in the light oil ignition...

Страница 39: ...ame and check its shape replacing the nozzle whenever a questio nable flame shape appears Whenever the burner is used intensely we recommend preventively replacing the nozzle at the start of each heat...

Страница 40: ...replace it if necessary 4 in order to replace the electrodes unscrew the VE fixing screws and remove them place the new electrodes being careful to observe the measures showed on pag reassemlbe follow...

Страница 41: ...ve cap 1 Screw in the protective cap with the O ring in it 6 Stick the adhesive label for spring identification on the type plate Cleaning and replacing the detection photocell The photocell working l...

Страница 42: ...ing to the laws in force in your country about the Disposal of materials Fig 42 Detection by electrode Fig 43 Detection by photocell QRA To check the detection signal remove the bridge on TEST ER or T...

Страница 43: ...GAS z z MAXIMUM GAS PRESSURE SWITCH DEFECTIVE z z THERMOSTATS PRESSURE SWITCHES DEFECTIVES z z z OVERLOAD TRIPPED INTERVENTION z AUXILIARIES FUSE INTERRUPTED z DEFECTIVE CONTROL BOX z z z z z DEFECTIV...

Страница 44: ...9 GAS VALVE GROUP DN100 Siemens VGD40 2190174 2190174 2190174 2190174 GAS VALVE ACTUATOR SKP15 2190181 2190181 2190181 2190181 GAS VALVE ACTUATOR SKP25 2190183 2190183 2190183 2190183 GAS VALVE GROUP...

Страница 45: ...N100 Siemens VGD40 2190174 2190174 2190174 2190174 GAS VALVE ACTUATOR SKP15 2190181 2190181 2190181 2190181 GAS VALVE ACTUATOR SKP25 2190183 2190183 2190183 2190183 GAS VALVE GROUP Rp2 Dungs MBC1200SE...

Страница 46: ...IN LOW FLAME INDICATOR LIGHT LEV1 INDICATOR LIGHT FOR OPENING OF ELECTRO VALVE EV1 LEV2 INDICATOR LIGHT FOR OPENING OF ELECTRO VALVE EV2 LEVG INDICATOR LIGHT FOR EVG 1 2 OPENING LPGMIN INDICATOR LIGHT...

Страница 47: ...C I B UNIGAS M039219CA 47 Wiring diagram 21 002 3...

Страница 48: ...C I B UNIGAS M039219CA 48...

Страница 49: ...C I B UNIGAS M039219CA 49...

Страница 50: ...C I B UNIGAS M039219CA 50 WIRING DIAGRAM Cod 11 336 2...

Страница 51: ...C I B UNIGAS M039219CA 51...

Страница 52: ...C I B UNIGAS M039219CA 52...

Страница 53: ...C I B UNIGAS M039219CA 53 WIRING DIAGRAM Cod 11 339 2...

Страница 54: ...C I B UNIGAS M039219CA 54...

Страница 55: ...C I B UNIGAS M039219CA 55...

Страница 56: ...C I B UNIGAS M039219CA 56...

Страница 57: ...minals 6 and 8 otherwise the mechanism will not start up the burner For a burner to start up the following conditions must be met z Mechanism not blocked reset z Damper closed Limit contact switchZ mu...

Страница 58: ...tection IP40 Permitted ambient temp 20 60 C Min temperature trans storage 50 C Weight apparatus approx 1 000g base approx 165g Ionisation monitor voltage in detector electrode normal working 330V 10 t...

Страница 59: ...for creating current between terminals 17 and 19 t5 interval for creating current between terminals 19 and 20 t6 post ventilation time t7 interval between startup consent and current created at termin...

Страница 60: ...and data subject to change Errors and omissions exceptd C I B UNIGAS S p A Via L Galvani 9 35011 Campodarsego PD ITALY Tel 39 049 9200944 Fax 39 049 9200945 9201269 web site www cibunigas it e mail ci...

Отзывы: