
C.I.B. UNIGAS - M039219CA
38
z
The burner is now operating, meanwhile the actuator goes to the high flame position and, after some seconds, the two-stage ope-
ration begins; the burner is driven automatically to high flame or low flame, according to the plant requirements.
Operation in high or low flame is signalled by lamp
N
on the frontal panel.
Light oil operation
z
The fan motor starts and the pre-purge phase as well. Since the pre-purge phase must be carried out at the maximum air rate, the
control box drives the actuator opening and when the maximum opening position is reached, the pre-purge time counting starts.
z
At the end of the pre-purge time, the actuator is in the light oil ignition position: the ignition transformer is energised (lamp
L
on); the
light oil valves open. Few seconds after the valves opening, the transformer is de-energised and lamp
L
turns off.
z
The burner is now operating, meanwhile the actuator goes to the high flame position; after some seconds, the two-stage operation
begins; the burner is driven automatically to high flame or low flame, according to the plant requirements.
Operation in high or low flame is signalled by LED
N
on the burner control panel.
Содержание HTP90A
Страница 47: ...C I B UNIGAS M039219CA 47 Wiring diagram 21 002 3...
Страница 48: ...C I B UNIGAS M039219CA 48...
Страница 49: ...C I B UNIGAS M039219CA 49...
Страница 50: ...C I B UNIGAS M039219CA 50 WIRING DIAGRAM Cod 11 336 2...
Страница 51: ...C I B UNIGAS M039219CA 51...
Страница 52: ...C I B UNIGAS M039219CA 52...
Страница 53: ...C I B UNIGAS M039219CA 53 WIRING DIAGRAM Cod 11 339 2...
Страница 54: ...C I B UNIGAS M039219CA 54...
Страница 55: ...C I B UNIGAS M039219CA 55...
Страница 56: ...C I B UNIGAS M039219CA 56...