V 24 30 B 1 EC2 BX
Cabinet Size (Nominal Minimum Capacity
24=24000Btu/hr (7.0kW)
30=30000Btu/hr (8.8kW)
36=36000Btu/hr (10.5kW) (only EC1 and EC2)
Nominal Maximum Capacity
Thousands Btu per hour
Power Supply, Motor Type
EC1=1,50/60,120 variable-speed
EC2=1,50/60,208/230 variable speed
Configuration
B= both (universal)
-
Model Series
V=Single piece vertical unit (fan coil)
Revision
1, 2, 3, etc.
Cooling Coil
B=ac/heat pump coil, 3-row with R410A TXV
E=ac/heat pump coil, 4-row with R410A TXV
Heating Coil
X=non included
H=hot water coil included
INTRODUCTION
General.
The information on the following pages is
to help the installer save time, provide the best possible
installation and insure continuous trouble-free
operation.
Scope.
These instructions apply to the Unico
V2430/3036/3642 Vertical Air Handler Unit. The
Unico vertical air handler unit (V-AHU) is a single
packaged unit. The cooling and heating coils are
contained within the same cabinet. The unit is
mounted in a vertical up-flow configuration. The coils
can be combined as a heating-only, cooling-only, or
heating and cooling fan coil unit (see Figure 1).
The vertical unit is available in three sizes: 2430, 3036,
and 3642. The heating only system includes the
blower/motor and a hot water coil. The cooling only
system includes the blower/motor and a cooling coil.
For the heating and cooling system both coils are
provided. The cooling coil is a heat pump coil (B-Style
or E-Style).
All insulated
Unico System
Vertical air handlers
feature closed-cell insulation for improved sound
attenuation. There is no exposed insulation.
The Unico System is a complete indoor comfort
system that includes an indoor fan coil unit and small
duct system. The fan coil unit and duct system were
designed to operate together to provide the proper
airflow in every installation. The conditioned air is
supplied through a series of two-inch diameter ducts as
a stream of air that entrains and mixes with the room
air. This process of aspiration produces a more even
temperature distribution in the room than a
conventional system.
Installation instructions for the air distribution system
are covered in other bulletins. Before beginning any
installation, a detailed system layout must be done in
accordance with
Bulletin 40-40 System Sizing and
Layout bulletin
.
SUFFICIENT
BUILDING
INSULATION
IS
ESSENTIAL FOR THE MOST ECONOMICAL
OPERATION
General Precautions and Safety Tips
Do not attempt
to install or startup unit without first reading and
understanding the appropriate sections in this manual.
Before operating, be sure the unit is properly
grounded.
Installation should be in accordance with all local
codes and regulations and with the National Fire
Protection
Association
and
Underwriters
Laboratories applicable standards and regulations.
In case of conflict, local codes take precedence.