31
Counter:
ACTION
Total reset Partial reset
Total per
group
A- Small + large
"coffees" + continuous
B-Small "coffee”
C-large "coffee”
TOTAL reset
x
x
x
D-Continuous/stop
Counter:
ACTION
Total reset Partial reset
Total per
group
A- Small + large
"coffees" + continuous
B-Small "coffee”
C-large "coffee”
D-Continuous/stop
TOTAL reset
x
x
x
In all events:
-
If there is a reset of a partial counter, the total per group is not reset.
-
The, E-Steam
S
team
A
ir
, F-Hot water counters count separately, they have no effect on the coffee
counters.
Operation of the "since the last inspection" counter (3rd line)
This counter is simply an indication for the user; it enables him to view the number of drinks that have been
produced since the last inspection of the counter.
This function is present in the 6 counters (A-B-C-D-E-F)
Содержание Stella di Caffe
Страница 1: ...NZ9009 02 15 ...
Страница 49: ...49 Diagrams BGX control box connections ...
Страница 50: ...50 BTA BST control box connections ...
Страница 51: ...51 CPU board connections Reserved for information connections ...
Страница 53: ...53 ...
Страница 55: ...55 ...
Страница 57: ...57 Wiring diagrams ...
Страница 58: ...58 ...
Страница 59: ...59 ...
Страница 77: ...77 ...
Страница 78: ...78 WITH INTERFACE JP8 12V CN13 CPU Pt no 45360 ...
Страница 79: ...79 WITHOUT INTERFACE CPU Pt no 45360 JP8 12V CN13 ...
Страница 84: ...84 The dotted lines represent the main menu 11 STELLA PROGRAMME FLOWCHART Level 0 User ...
Страница 85: ...85 The dotted lines represent the main menu Level 1 Coffee specialist Direct Access ...
Страница 86: ...86 If installed in the machine Level 2 Barista The dotted lines represent the main menu Direct Access ...
Страница 87: ...87 The dotted lines represent the main menu Level 3 Manager Boss Direct Access ...
Страница 88: ...88 The dotted lines represent the main menu Level 4 Technician USB dongle level Direct Access ...
Страница 90: ...90 ...
Страница 94: ...94 ...