TABLE OF CONTENTS
PAGE
FOREWORD
1
MACHINE SETUP INSTRUCTIONS
2-3
Machine Location
2
Machine Preparation
2
Electrical Connections
2
Lubrication
3
OPERATING INSTRUCTIONS
3-6
Pre-Operating Instructions
3
Practice Operations
3-4
Operating the Model PRO56 Ironworker
4
Stroke Control Adjustment
4
Punching Operation
4-5
Sever Angle Shear Operation
5
Notcher Station Operation
5
Bar Shear Operation
5-6
MAINTENANCE
6-7
Punch Installation
6
Double Locking the Punch
6
Removing and Replacing Angle and Bar Blades
7
Standard Angle Shear
7
Machine Maintenance
8
LUBRICATION
8-9
Machine Components
8
Hydraulic System
8
Oil Level
8
Lines and Fittings
8
Hydraulic Oil Change
9
Tonnage Chart
10
TROUBLE SHOOTING
11
Proper Care of Punches and Dies
12
Lining up Punch and Die
12
Lubrication
12
Stripping
12
Loose Nuts and Shank
12
WARRANTY
13
General Wiring Schematic
14
GE Control Box
15
Содержание PRO 56
Страница 18: ......
Страница 19: ......
Страница 20: ......
Страница 21: ......
Страница 22: ......
Страница 23: ......
Страница 24: ......
Страница 25: ......
Страница 26: ......
Страница 27: ......
Страница 28: ......
Страница 29: ......
Страница 30: ......
Страница 31: ......
Страница 32: ......
Страница 33: ......
Страница 34: ......
Страница 35: ......
Страница 36: ......
Страница 37: ......
Страница 38: ......
Страница 39: ......
Страница 40: ......
Страница 41: ......
Страница 42: ......
Страница 43: ......
Страница 44: ...0668...
Страница 45: ......
Страница 47: ......
Страница 48: ......
Страница 49: ......
Страница 50: ......
Страница 51: ......
Страница 52: ......
Страница 53: ......
Страница 54: ......
Страница 55: ......
Страница 56: ......
Страница 57: ......
Страница 58: ......
Страница 59: ......
Страница 60: ......
Страница 61: ......
Страница 62: ......
Страница 63: ......
Страница 64: ......
Страница 65: ......
Страница 66: ......
Страница 67: ......
Страница 68: ......
Страница 69: ......
Страница 73: ...Over 20 000 Punch Die Sets in stock For 66 ton Up...