ASSEMBLY INSTRUCTIONS

A Flow Cell modular unit starts with a framework of vertical Posts & horizontal Beams 

(Flow Cell Structure)

bolted together with 3/8"-16 hardware (included)—only one wrench size (9/16") is required.
This base structure plus 

Span-Track carton flow track

and any of several optional features

complete the Flow Cell assembly.

Attach side Beams (2) to Posts (2) for each side of cell — one high, one low.
FlowCell with Tool Bar will have 2 longer posts at front. Note: Ensure foot
plates oriented in the same direction. If using rigid casters, align long
dimension of plates in direction cell is to roll.

1

Join the 2 sides by bolting on front
beams at discharge heights at front of
cell. For return lane front beam would
be at load height.

2

Bolt on rear beams for each level
approximately 1" higher per foot than
front beams. Recommended pitch is 1
inch for every 1 foot of rack depth.

3

Slip plastic End Caps onto posts.

4

UNEX MANUFACTURING, INC.              www.unex.com/resources/video-library

50 Progress Place, Jackson, NJ 08527
800.695.SPAN (7726)
732-928-2800  •  fax: 732-928-2828  •  e-mail: [email protected]  •  unex.com

FLOW CELL STRUCTURE

FLOW CELL OPTIONS 

(all necessary brackets and hardware are included)

(video instruction hyperlinks below in text)

NOTE:

Before

attaching side Beams,
determine front &
rear Beam positions
(be sure to consider
pitch), since side
Beams cannot share
Post locations with
front & rear Beams.

CASTERS

Attach casters to
foot plates using
3/8" bolts. (provided)

http://www.youtube.com/watch?v=FmfHPMQroU4

WORKBENCH

Attach shelf brackets (2) to posts at desired height
using 3/8  bolts. Attach workbench, inserting 4
bolts from below.

http://www.youtube.com/watch?v=sJKyUwg0SmU

ADD-ON TRAY

Attach tray brackets to tray. Hang back of tray
over front beam. Bolt brackets to posts. Attach
full-length Label Holder to front surface of
Add-On Tray using two-sided tape (provided
on back side of Label Holder).

For detailed video installation instructions, please go to: www.unex.com/resources/video-library

OVERHEAD TOOL BAR

Attach brackets (2) at top of front posts using 3/8"
bolts. Attach tool bar strut channel with 2 bolts
inserted from below, and 2 strut nuts.

http://www.youtube.com/watch?v=6fNYzAxCfww