C30VR Compressor Installation, Operation, Maintenance and Troubleshooting
7-10
ULVAC CRYOGENICS INCORPORATED
7.4 Regular maintenance of helium lines, cooling water piping and electrical
wiring
Conduct inspection on helium lines, cooling water piping and electrical wiring every 12000
hours.
Inspect connection parts of helium lines and cooling water piping for evidence of leakage.
Also check that there is no damage in these plumbing.
For electrical wiring, inspect the refrigerator cable of the compressor and remote
input-output cable to ensure that they are connected firmly. At the inspection, turn off the
compressor unit by turning OFF the breaker on the distribution panel at the equipment side.
Lock the breaker at OFF status for safety reason. Disconnect the input power cable from
the compressor.
Fol wing procedure must be undertaken by authorized electrician and mechanical
personnel familiar with the construction and risk of this equipment. Failure to observe this
WARNING
lo
warning may result in severe bodily injury or fatal accident.
7.5 Maintenance parts
Table 7-3 shows parts that need replacement during maintenance. Replace them when
needed referring the replacing cycle in the table.
Table 7-3
Maintenance parts
Parts Type
(*1)
Replacing cycle
Adsorber
S
Max. 24,000h (30,000h for C30MVER).
Gasket for helium coupling
U
When it is damaged or becomes dirty.
(*1)
Maintenance type
S: Scheduled U: Unscheduled
NOTE:
For more information on planning maintenance, purchasing maintenance parts,
diagnosis, and servicing,
please contact our Service Engineering Division or the nearest
customer support center.
Содержание C30MVER
Страница 2: ......
Страница 8: ...F 6 ULVAC CRYOGENICS INCORPORATED This page intentionally left blank ...
Страница 16: ...S 4 ULVAC CRYOGENICS INCORPORATED This page intentionally left blank ...
Страница 18: ...IW 2 ULVAC CRYOGENICS INCORPORATED This page intentionally left blank ...
Страница 32: ...C30VR Compressor Instruction Manual 1 14 ULVAC CRYOGENICS INCORPORATED This page intentionally left blank ...
Страница 108: ...CS 2 ULVAC CRYOGENICS INCORPORATED This page intentionally left blank ...
Страница 110: ...Revision History R 2 ULVAC CRYOGENICS INCORPORATED This page intentionally left blank ...