background image

300-C Series 1/16/17

www.ultra-tec.com

800-851-2961 | 775-885-1443

Kit 300-C Series Installation Instructions

for Wood Posts with Composite Sleeves

with an Outside Diameter Greater than 4-1/2"

300-C Series

Push-Lock

®

 

Extended 

Length   

Lag

1/8” or 3/16” 

1x19 stainless 

steel cable

Adjust-a-Body

®

 

with
Extended 
Length  
Hanger Bolt

B.  Install Tensioning Terminal

1.

  Install the the Adjust-A-Body

®

 with Extended Length 

Hanger Bolt by driving the hanger bolt / lag end into  
the pre-drilled pilot hole in your end post using a  
1/4” open-end wrench. (Figure 1)

2.

  Screw the lock nut all the way onto the 2”-long threaded 

end of the bolt. (Figure 2) Note: turn counter-clockwise 
to tighten/tension/close.

A:  Drill Posts

Hole sizes through intermediate posts  

and/or cable braces are:

 

5/32” for 1/8” cable  
7/32” for 3/16” cable

End posts:

Drill 7/32” hole 1-1/2" deep into the face of the end posts.

4.

  Thread the body (with the cable attached) 

onto the Hanger Bolt and turn 8 turns onto 
the male threads. (Figure 4)

3.

  Slide the body of the Adjust-a-Body

®

 with Extended Length Hanger Bolt 

Tensioner onto the bare end of the cable, threaded end first, and pull it the 

length of the cable until it is stopped by the ferrule already swaged onto 
the cable. (Figure 3)

C.  Feed Cable through Intermediate Posts

1.

  Feed the bare end of the 

cable through all your 
intermediate posts and to 
the end post where you 
will be installing the  
Push-Lock

®

 fitting.

1½” minimum

inside of post

7/32”

dia.

11½

½” minimum

” m

minimum

m

1½” minimum

Figure 1

Figure 3

Figure 4

Figure 2

Turn body onto bolt

Lock Nut

Bolt

Pre-swaged ferrule

Slide body onto cable

Pre-swaged ferrule

Pull cable back 

Feed bare end of cable through all other posts.

INTERMEDIATE POST

CABLE BRACE

CABLE BRACE

Lock Nut

Bolt

Отзывы: