25
UltraPlay Play Systems
800.458.5872 • www.ultraplay.com
A,B
& C
D
D
F
E
Figure 1.
1. Locate: (2) Lower Posts(A) - Posts #1 and #2
(3) Lower Posts(B) - Posts #3, #5 and #6
(1) Lower Post(C) - Post #4.
NOTE: Lower Posts are identifed by number decals.
2. Connect Footer(D) to Lower Posts(A,B,C) using
(2) Bolts(E) and (2) Lock Nuts(F).
See Figure1.
NOTE: 8” Footer(D) shown in illustration.
Use 2” Footer for 2-1/2” rubber tiles.
NOTE: If installing play structure with concrete
footers, install In-ground footers at this time.
See Footing Detail Page .
NOTE: Refer to USE ZONE page for proper structure
placement before beginning installation process.
A
A
C
B
B
B
4
2
6
3
1
5
STEP 1 - CONNECT FOOTERS TO LOWER POSTS
Parts List
Letter
Description
Quantity Part Number
A
Lower Post - 31.5” Long
2
02-08-0110
B
Lower Post - 39.4” Long
4
02-08-0111
C
Lower Post - 73.62” Long
1
02-08-0113
D
Footer - 8”
6
02-08-0134
D
Footer - 2”
6
02-08-0135
Hardware Complete
1
33-12-1020
E
M10 x 25mm(1”) BHCS Bolt
12
33-11-0003
F
M10 Lock Nut
12
33-11-0400
Содержание Discovery Centers DC-2MDR
Страница 1: ...MODEL DC 2MD MODEL DC 2MDR 03 31 11 MODEL DC 2MDR MODEL DC 2MD ASSEMBLY INSTRUCTIONS...
Страница 2: ......