
27
NT UF 811 CO GB (c) / March 2014
3.4 Ground connection
For the ground connection, it is recommended to use a copper braid. When choosing the braid, it is
important to respect the following rule:
Length / Width < 3
3.5 Connection
Once the unit is fixed and the cables installed in the connectors, the probe connectors, input/output
connectors, communication connector and finally (last of all) the power supply connector must be screwed
into their allocated positions.
The connectors of the Uf 811 box are installed as shown on the figure below:
POWER
COM
I/O 2
I/O 1
Chord 2
Chord 1
Important
: All connectors must be connected with the equipment powered off, isolated and locked and
tagged, by authorized staff. The power supply connector must be the last to be connected.
Screw the connector to the cable using the torque intended for the connector.
Note
: If a connection is not used, cap it off at the Uf 811 in order to maintain IP67 leaktightness
Ground connection
Bar
Braid
Green / yellow wire
Содержание Uf 811 CO
Страница 4: ...4 NT UF 811 CO GB c March 2014 CHAPTER 1 OVERVIEW...
Страница 11: ...11 NT UF 811 CO GB c March 2014 CHAPTER 2 SAFETY INSTRUCTIONS...
Страница 14: ...14 NT UF 811 CO GB c March 2014 CHAPTER 3 INSTALLATION AND WIRING...
Страница 28: ...28 NT UF 811 CO GB c March 2014 CHAPTER 4 IMPLEMENTING A MEASURING POINT...
Страница 32: ...32 NT UF 811 CO GB c March 2014 CHAPTER 5 USING AND CONFIGURING THE Uf 811...
Страница 65: ...65 NT UF 811 CO GB c March 2014 CHAPTER 6 FUNCTION ENGINE...
Страница 67: ...67 NT UF 811 CO GB c March 2014 CHAPTER 7 PC SOFTWARE...
Страница 83: ...83 NT UF 811 CO GB c March 2014 Appendix I Characteristic echo signals...
Страница 86: ...86 NT UF 811 CO GB c March 2014 Appendix II Speed of sound in water...