www.ultraoptics.com
page 6
System Operation
Start-up Procedure
The following procedure should be followed after the 44R has been shut-down, but not
completely powered down. An example of this situation would be when the machine has been
shut-down at the end of the day. This procedure does not apply to the first time the machine is
powered-up. Specifically, the following procedure should be followed the next time the system
is to be run after it was previously shut-down by turning off the air supply and pressing the
Power button near the touchscreen.
1. Perform all of the daily activities listed in the Scheduled Maintenance section of this
manual (see page 19).
2. Turn on the air supply to the machine.
3.
Turn the power switch to “ON” at the Operator Interface Terminal (OIT).
4. Wait for the system to warm up the UV lamp. This process can take five to 15 minutes.
If it takes 15 minutes, the system will produce an alarm. In this case, please see page
43 of this manual for further instruction.
5. Go to the Production screen by touching the Auto Mode button.