4
Preparing to Install
Product Verification
Check shipped product and confirm that all hardware is present.
Required Materials
Electrical Connectors:
Small supply of assorted electrical connectors and wire nuts.
Electrical Tape:
Assorted colors
Wire Labels:
To clearly mark all wires in the irrigation clock.
Wire Ties
Wire Tacks:
to secure any loose wires to mounting structure.
Silicone:
For water-tight seal of wiring harness strain relief connection to clock.
Mounting Screws:
To mount brackets to wall.
Required Tools
Digital Multi-meter:
Also known as a Voltmeter. Required to test AC polarity and confirm proper wiring.
Screwdriver:
Phillips #1, #2 and small electrical screwdrivers for tightening terminals.
Cordless Drill/Bits:
For drilling holes for mounting screws.
One Inch (1”) Hole Saw Bit:
For drilling a hole into the irrigation clock
Wire Strippers, Side Cutters and Crimpers:
Necessary to install Base Station
Shovel or Hole Cutter:
For digging holes for placement of sensors.
1.25 inch Putty Knife:
Or something similar for cutting slot in soil for tine insertion.
10 Inch Crescent Wrench or Channel Locks:
To tighten strain relief nut.
Tape Measure:
To measure sensor location.
UgMO Soil Press:
To determine soil type.
Irrigation Flags:
To mark sensor locations.
UgMO Base Station
UgMO Wireless Sensor
Mounting Bracket
Yellow Whisker Marker
One per Sensor
Содержание ProHome PH100WS
Страница 2: ...Installation and User Manual ...
Страница 7: ...3 13 14 15 ...
Страница 49: ...45 ...