Connecting Power 

 

 

DC Version 

 

1.

 

Ensure there is enough power to supply the system. 
The maximum system power consumption is 1234.7 watts. It is recommended to ensure that 
enough power is reserved from the power distribution system before installation. Also, please 
ensure that both PSUs have been properly installed before powering up the equipment, as the 
S9700-23D is designed to support 1 + 1 power redundancy. 

2.

 

Attach the DC power cables to the lugs. 
The UL 1015, #6 AWG DC power cable (not provided) must be attached to a two-hole lug 
before connecting to the PSU. The following instructions are for connecting the DC Power 
Cable to the lug: 

2.1  Strip the insulation from a DC Power Cable, leaving 

0.5” +/

-

0.02” (12.7mm +/

-0.5mm) of 

exposed cable 

2.2  Insert the exposed DC power cable into the heat shrink tubing, the length of heat shrink 
tubing should not less than 38.5mm. 
2.3 

Insert the exposed DC power cable all the way into the hollow tube of the lug (provided 

with the package contents). 

2.4 

Using a crimping tool, firmly secure the DC power cable to the lug. It is recommended to not 

crimp exceeding the lines indicated on the lug, which is also depicted as the cross-section area 
in the picture on the below. 

 

Figure 22. 

 

2.5 

Move the heat shrink tubing to cover any exposed metal on the DC power cable and lug.

 

 

Содержание S9700-23D

Страница 1: ...Hardware Installation Guide S9700 23D Core Edge Router R1 0...

Страница 2: ...SU Overview 7 Fan Overview 8 Port Overview 9 5 Rack Mounting 10 6 Installing Fan Modules 13 7 Installing Power Supply Units 14 8 Grounding the Router 16 9 Connecting Power 18 DC Version 18 AC Version...

Страница 3: ...00 23D enables service providers to meet the high traffic loading in 5G application scenarios In the past monolithic chassis was the only solution for carrier aggregation and core networks now the S97...

Страница 4: ...ow wire for grounding Crimping tool Wire stripping tool All illustrations within this document are for reference purposes only Actual objects may differ PC with terminal emulation software Refer to th...

Страница 5: ...r circuit Space Clearance The S9700 23D chassis width is 17 16 inches 43 6cm and is shipped with an adjustable mounting rail kit suited for standard 19 inch 48 3cm wide racks The depth of the S9700 23...

Страница 6: ...lation spacing requirement S9700 23D chassis spacing requires a height of 2RU 3 45 8 8cm a width of 19 48 3cm and a depth of 42 inches 106 6cm Thermal requirement S9700 23D working temperature is 0 C...

Страница 7: ...5 x 12 5mm 1 pcs 0 03lbs 15 3g 1 pcs 2 Screw Kit for Grounding Lug 2 x Screw M4 L8 0mm 2 x M4 Lock Washers 2 sets 0 01lbs 2 6g 1 set 3 Micro USB Cable 3 28 1m 1 pcs 0 05lbs 24 4g 1 pcs 4 RJ45 to DB9...

Страница 8: ...C PSU 2 65lbs 1 2kg AC PSU 2 65lbs 1 2kg Fan module 1 10lbs 498g Ground lug 0 15lbs 66 2g Adjustable mounting rail 7 05lbs 3 2kg Micro USB cable 0 05lbs 24 4g RJ45 to DB9 Female cable 0 23lbs 105g AC...

Страница 9: ...23D Hardware Installation Guide 7 4 Identifying Your System S9700 23D Overview Figure 4 PSU Overview Power supply unit PSU with 1 1 Redundancy Hot swappable field replaceable unit FRU AC Version Figu...

Страница 10: ...S9700 23D Hardware Installation Guide 8 DC Version Figure 6 Fan Overview 3 1 Redundant hot swappable field replaceable unit FRU Figure 7...

Страница 11: ...akout 0 12 QSFP DD 328ft 100m 400GE The service ports labelled in blue in figure below are ethernet packet based ports used to connect to servers and other networking equipment The fabric ports labell...

Страница 12: ...ail from the outer rail The white tab is located on the inner rail 1 3 Once the inner rail is separated push the tab located on the outer rail to unlock and slide the middle rail back Figure 9 2 Insta...

Страница 13: ...e heard when the bracket is secured onto the rack Figure 11 4 Insert the Chassis to complete the installation 4 1 Pull the middle rail fully extended into lock position an audible click can be heard w...

Страница 14: ...S9700 23D Hardware Installation Guide 12 Figure 12...

Страница 15: ...n module Then press and hold the release tab to unlock the fan module Figure 13 2 While holding down the release tab grip the fan handle and gently pull the fan module out of the fan bay Figure 14 3 A...

Страница 16: ...power input for AC power supply is only 110V there will only be 1000 watts per power supply and will not be enough power for the power supply to be changed while the router is in operation In order fo...

Страница 17: ...PSU s power connector is in the correct position 4 Carefully slide the new PSU into the power bay and gently push until it is flush with the case 5 An audible click will be heard when the PSU is inst...

Страница 18: ...onto the case This equipment must be grounded Do not defeat the ground conductor or operate the equipment without correctly grounding the equipment If there is any uncertainty about the integrity of...

Страница 19: ...or securing the grounding lug which is located on the rear of the router and remove the protective label Figure 20 6 Using 2 M4 screws and 4 washers provided with the package contents firmly lock the...

Страница 20: ...lug before connecting to the PSU The following instructions are for connecting the DC Power Cable to the lug 2 1 Strip the insulation from a DC Power Cable leaving 0 5 0 02 12 7mm 0 5mm of exposed cab...

Страница 21: ...lled DC version with insulation material as below Figure 24 3 Attach the power cable Locate the DC power screw type terminal block located on the PSU Remove the plastic cover that is protecting the te...

Страница 22: ...se based on the PSU maximum capacity which will act as a second tier system protection in case the power distribution unit s fuse is not functioning 6 Verify that the power supply is operating If conn...

Страница 23: ...e power distribution unit s fuse is not functioning 4 Verify that the power supply is operating If connected correctly when turned on the LED on the PSU will light up with a solid Green color designat...

Страница 24: ...id Amber Power is up but Host CPU BMC is not up Blinking Amber Reserved FAN OFF No FAN modules present or FAN modules are not initialized Solid Green All FAN modules are working well Blinking Green Re...

Страница 25: ...hutdown failure over current short circuit over voltage fan failure and or over temperature Blinking Red 1 sec Input power cord unplugged or input power lost with a second power supply in parallel sti...

Страница 26: ...ing with micro USB drivers will need to be installed To connect the console using the RJ45 IOIO port locate the port labelled IOIO then plug a serial cable into the console port and connect the other...

Страница 27: ...the CLI The username and password should be provided by the Network Operating System NOS vendor 12 Cable Connections Connecting the USB Extender Cable Connect the USB 3 0 A Type plug male connector i...

Страница 28: ...during handling It is also recommended the cabling be done by a professional who is grounded such as by wearing an ESD wrist strap The following the steps below for connecting a transceiver 1 Remove t...

Страница 29: ...ice ensure that the rack can support it without compromising stability Otherwise personal injury and or equipment damage may result Caution This unit must be installed indoors The unit AC power suppli...

Страница 30: ...rference at his own expense Changes or modifications made to this device which are not expressly approved by the party responsible for compliance could void the user s authority to operate the equipme...

Страница 31: ...he National Electric Code applies The approximate system boot time when the AC or DC power source is connected is 110 secs in Ubuntu Linux system The boot up time would depend on different NOS system...

Страница 32: ...www ufispace com www ufispace com...

Отзывы: