UfiSpace S9610-36D Скачать руководство пользователя страница 1

 

 

Hardware Installation Guide 

S9610-36D 

Open Aggregation Router 

R1.1 

Содержание S9610-36D

Страница 1: ...Hardware Installation Guide S9610 36D Open Aggregation Router R1 1 ...

Страница 2: ...t Overview 9 5 Rack Mounting 10 6 Installing Fan Modules 13 7 Installing Power Supply Units 14 8 Grounding the Router 16 9 Connecting Power 18 DC Version 18 AC Version 20 10 Verifying System Operation 22 Front Panel LED 22 PSU FRU LED 22 Fan FRU LED 23 11 Initial System Setup 24 12 Cable Connections 26 Connecting the USB Extender Cable 26 Connecting the 1PPS Interface 26 Connecting the 10MHz Inter...

Страница 3: ... aggregation Our S9610 36D is capable of mobile network aggregation with support for SyncE and IEEE 1588v2 with Class C timing accuracy The S9610 36D open aggregation router uses the Broadcom J2C silicon which provides 16GB deep buffering and 14 4Tbps switching capacity It includes a knowledge based processor or TCAM to perform high performance parallel searches to reach decision speeds of multipl...

Страница 4: ...r grounding 4 AWG DC power cable Crimping tool Wire stripping tool All illustrations within this document are for reference purposes only Actual objects may differ PC with terminal emulation software Refer to the Initial System Setup section for details Baud rate 115200 bps Data bits 8 Parity None Stop bits 1 Flow control None ...

Страница 5: ...ed with a rack mount brackets suitable for 19 inch 48 3cm wide racks The depth of the S9610 36D chassis is 30 inches 76 2cm without the field replaceable units FRUs and comes with adjustable check mounting rails suitable for rack depths of 22 inches 55 9cm to 33 inches 83 8cm The handle for the fan units will extend outwards by 1 15 inch 2 9cm and the handle for the power supplies will extend outw...

Страница 6: ...tallation space requirements S9610 36D requires 2RU 3 45 8 8cm in height 19 48 3cm in width and need a minimum reserve depth of 36 inches 91 4cm Thermal requirements S9610 36D working temperature is 0 to 45 C 32 F to 113 F airflow direction is front to back Installation tools required 2 Philips Screwdriver 6 AWG yellow and green wire stripper and crimping tool Accessories required PC with USB port...

Страница 7: ...AWG 2 40 x 0 60 x 0 42 60 96 x 15 24 x 10 67mm 1 set 0 18lb 81 48g 1 set 3 Micro USB Cable 3 28 1m 1 pcs 0 05lb 24 4g 1 pcs 4 RJ45 to DB9 Female Cable 8 2 438m 1 pcs 0 23lb 105g 1 pcs 5 Adjustable Mounting Rail for 4 post 30 4 x 1 7 x 0 9 771 x 44 x 22mm 22 33 rack depth 2 sets 7 05lb 3 2kg 2 sets 3 53lb 1 6kg 1 set 6 Screw Kit for Rack Mount Bracket 2 x Screw M4 0 L5 5 1 set 0 004lb 1 9g 1 set 7 ...

Страница 8: ... 1 9kg AC PSU 4 60lb 2 1kg Fan module 1 63lb 737g Ground lug 0 05lb 21 1g Adjustable mounting rail 3 53lb 1 6kg Micro USB cable 0 05lb 24 4g RJ45 to DB9 female cable 0 23lb 105g AC power cord AC version only 0 7lb 318g USB 3 0 cable 0 03lb 13 6g Dimension S9610 36D W x D x H 17 16 x 30 x 3 45 436 x 762 x 87 7mm PSU W x D x H 2 68 x 18 06 x 1 60 68 x 458 8 x 40 6mm Fan W x D x H 3 19 x 5 96 x 3 21 ...

Страница 9: ...0 36D Hardware Installation Guide 7 4 Identifying Your System S9610 36D Overview Figure 4 PSU Overview Power supply unit PSU with 1 1 Redundancy Hot swappable field replaceable unit FRU AC Version Figure 5 ...

Страница 10: ...S9610 36D Hardware Installation Guide 8 DC Version Figure 6 Fan Overview 3 1 Redundant hot swappable field replaceable unit FRU Figure 7 ...

Страница 11: ...sabled and reserved for statistics functionality Therefore when statistics counter is enabled there will only be 32 service ports available Figure 8 The S9610 36D has the following 400G ports with the power capacity to support OpenZR and 400ZR for WAN and long haul applications With statistic counter disabled ports 0 5 10 13 18 21 26 29 34 35 labelled in orange can support OpenZR and 400ZR With st...

Страница 12: ...ail from the outer rail The white tab is located on the inner rail 1 3 Once the inner rail is separated push the tab located on the outer rail to unlock and slide the middle rail back Figure 10 2 Install the inner rails onto the chassis 2 1 The inner rail has key shaped holes where attachment pins on the chassis can be aligned The chassis has 5 attachment pins on each side for a total of 10 pins F...

Страница 13: ...be heard when the bracket is secured onto the rack Figure 12 4 Insert the Chassis to complete the installation 4 1 Pull the middle rail fully extended into lock position an audible click can be heard when the middle rail is fully extended and locked into position 4 2 Insert the chassis by lining up the inner rails into the slot of the middle rail 4 3 Slide the chassis into the middle rail until it...

Страница 14: ...S9610 36D Hardware Installation Guide 12 Figure 13 ...

Страница 15: ...an module Then press and hold the release tab to unlock the fan module Figure 14 2 While holding down the release tab grip the fan handle and gently pull the fan module out of the fan bay Figure 15 3 Align the new fan module with the fan bay ensuring that the fan module s power connector is in the correct position 4 Carefully slide the new fan module into the fan bay and gently push until it is fl...

Страница 16: ...s Caution Shock hazard TO DISCONNECT POWER REMOVE ALL POWER CORDS FROM UNIT DC AC Figure 17 1 Locate the red release tab on the PSU Then press and hold down the release tab to unlock the PSU 2 While holding down the red release tab grip the PSU s handle and firmly pull it out of the power bay DC Version AC Version Figure 18 3 Align the new PSU with the power bay ensuring the PSU s power connector ...

Страница 17: ...S9610 36D Hardware Installation Guide 15 way if it is in the wrong direction Figure 19 ...

Страница 18: ...ective label The following instructions are for installing the grounding lug onto the case 1 Before grounding the router ensure that the rack is properly grounded and in compliance with local regulatory guidelines Ensure that there is nothing that can obstruct the connection for grounding and remove any paint or materials that may prevent good grounding contact 2 Strip the insulation from a size 4...

Страница 19: ...0 36D Hardware Installation Guide 17 Figure 21 6 Using 2 M4 screws and 4 washers provided with the package contents firmly lock the grounding lug to the designated grounding location on the router Figure 22 ...

Страница 20: ...edundancy 2 Attach the DC power cables to the lugs The UL 1015 4 AWG DC power cable not provided must be attached to a two hole lug before connecting to the PSU The following instructions are for connecting the DC Power Cable to the lug 2 1 Strip the insulation from a DC Power Cable leaving 0 94 0 02 23 9mm 0 5mm of exposed cable 2 2 Insert the exposed DC power cable into the heat shrink tubing th...

Страница 21: ...hrink tubing to cool before attaching the DC power cable An example of the installed DC version with insulation material as below Figure 25 3 Attach the power cable Locate the DC power screw type terminal block located on the PSU Remove the plastic cover that is protecting the terminal block by removing the single screw locking it in place Secure the two hole lugs with the DC power cable attached ...

Страница 22: ...ately output 12 3V and 12VSB to the system with a 40 to 72V DC power source The PSU has a built in 150A fast acting fuse based on the PSU maximum capacity which will act as a second tier system protection in case the power distribution unit s fuse is not functioning 6 Verify that the power supply is operating If connected correctly when turned on the LED on the PSU will light up with a Green color...

Страница 23: ...he system The PSU will immediately output 12 3V 12VSB to the system with a 200 240V AC power source The PSU has a built in 25 amperes fast acting fuse based on the PSU maximum capacity which will act as a second tier system protection in case the power distribution unit s fuse is not functioning 4 Verify that the power supply is operating If connected correctly when turned on the LED on the PSU wi...

Страница 24: ... Amber System timing clock synchronization is in free run or holdover mode SYS OFF No power Solid Green Host CPU BMC boot complete Solid Amber Power is up but Host CPU BMC boot failed FAN OFF No FAN modules present or FAN modules are not initialized Solid Green All FAN modules are working normal Solid Amber One or more FAN module s need service PS0 OFF No Power Solid Green PSU0 is working normal S...

Страница 25: ...Blinking Amber 1Hz Over temp warning Fan error Blinking Green 2Hz FW upgrading Solid Amber 12 3V main output or 12VSB out or range OTP OVP UVP OCP OTP Over Temperature Protection OVP Over Voltage Protection UVP Under Voltage Protection OCP Over Current Protection Fan FRU LED Additional information about fan status can be obtained by the LEDs located on the fan itself LED Condition Equipment Status...

Страница 26: ...he console can be connected either with the IOIO port or the micro USB port If connecting with USB drivers will need to be installed To connect the console using the IOIO port locate the port labelled IOIO then plug a serial cable into the console port and connect the other end to the PC or laptop Cable types may vary depending on the router model Figure 29 To connect the console using the micro U...

Страница 27: ... HyperTerminal Windows PC Putty or TeraTerm and configure the application The following settings are for a Windows environment other operating systems may vary Baud rate 115200 bps Data bits 8 Parity None Stop bits 1 Flow control None 4 Login to the device After the connection is established a prompt for the username and password displays Enter the username and password to access the CLI The usern...

Страница 28: ...e Connect the USB 3 0 A Type plug male connector into the USB port female connector located on the front panel of the router This USB port is a maintenance port Figure 31 Connecting the 1PPS Interface Connect an external 1PPS cable with an impedance of 50 ohms to the port labelled 1PPS Figure 32 ...

Страница 29: ... cable and record its respective connection Maintain a clear line of sight to the port LEDs by routing the cables away from the LEDs Before connecting anything cables transceivers etc to the router please ensure to discharge any static electricity that may have built up during handling It is also recommended the cabling be done by a professional who is grounded such as by wearing an ESD wrist stra...

Страница 30: ...the rack can support it without compromising stability Otherwise personal injury and or equipment damage may result Caution This unit must be installed indoors The unit AC power supplies DC power supplies and its cables are not designed for outdoor use Caution Use of controls or adjustments or performance of procedures other than those specified herein may result in hazardous radiation exposure Wa...

Страница 31: ...ed Do not defeat the ground conductor or operate the equipment without correctly grounding the equipment If there is any uncertainty about the integrity of the equipment s grounding please contact the electrical inspection authority or a certified electrician Industry Canada Notice CAN ICES 003 A NMB 003 A This digital apparatus does not exceed the class A limits for radio noise emissions from dig...

Страница 32: ...sonnel or users familiar with restrictions applied to the location reasons therefore and any precautions required Only afforded by the use of a tool or lock and key or other means of security and controlled by the authority responsible for the location Suitable for installation in Information Technology Rooms in accordance with Article 645 of the National Electrical Code and NFPA 75 ...

Страница 33: ...www ufispace com www ufispace com ...

Отзывы: