
ETH-SP-G2 Quick Start Guide
https://dl.ubnt.com/qsg/ETH-SP-G2/ETH-SP-G2_EN.html[1/20/2020 4:04:01 PM]
ETH-SP-G2
M5 Self-Tapping Screw
M5 Serrated Washer
ETH IN/OUT Port
Grounding Point
Package Contents
Hardware Overview
Passive surge-protected RJ45 Ethernet ports.
The ETH-SP-G2 must be grounded by one of the following methods:
Using the included Self-Tapping Screw to ground the ETH-SP-G2 directly to a grounded
metal pole or structure; or
Using an M5 machine screw and nut (not included) to attach a drain wire that is
ETH-SP-G2 Quick Start Guide
Содержание ETH-SP-G2
Страница 7: ...ETH SP G2 Quick Start Guide https dl ubnt com qsg ETH SP G2 ETH SP G2_EN html 1 20 2020 4 04 01 PM 3 ...
Страница 8: ...ETH SP G2 Quick Start Guide https dl ubnt com qsg ETH SP G2 ETH SP G2_EN html 1 20 2020 4 04 01 PM 4 ...
Страница 9: ...ETH SP G2 Quick Start Guide https dl ubnt com qsg ETH SP G2 ETH SP G2_EN html 1 20 2020 4 04 01 PM ...