UAV-1003947-001, AV-30-C, Installation Manual
3
Rev E
1 Revision History
Revision
Date
Comments
A
4/24/2020 Initial release
B
7/13/2020
Added installation log-book entry requirement.
Added method to determine proper screw
length. Highlighted primary functions. Added
items included in the ICA. Added startup time
and AoA reference per MOPS requirement.
Added reference to CFR 23.1321.
C
8/10/2020
Added reference to AoA operation in inverted
flight and operation in excess of G limits.
Added reference to utilize wire type in
accordance with AC 43.13-1B.
D
6/3/2021
Updated Top Level Assembly references.
E
9/2/2021
Software update to 2.1.2
Added Definition of Acronyms & Terms section
Added requirement for pitot / static connection
Add vibration check to System Checkout