UAV-1003947-001, AV-30-C, Installation Manual
29
Rev E
Figure 8 - Wiring Diagram
– DG Position Installation
11.8 Bonding Requirements
The following figure shows the grounding requirements for the electrical
connections. The two D-Sub screws are to be utilized for shield and ground
strap connections.
The supplied ring terminal connectors are sized for these screws.