PARTS FOR BASE UNIT

ASSEMBLY INSTRUCTIONS FOR BASE UNIT

NOTE: Identify all components according to 

chart above. If any components are missing or 
damaged, contact Uline Customer Service.

1.  Attach each side brace (C) to end frames (A) at the 

desired platform height. Be sure the locking pins on 

each side brace are fully locked in the end frame at 

all 4 locations. (See Figure 1)

2.  Install platform (B) so that it is fully seated and level 

in both side braces (C) Be sure the deck pins are in 

the engaged position. (See Figure 2)

3.  Install 4 casters (E) into both end frames (A) and 

secure with snap pins (D). (See Figure 3)

WARNING! Side braces must be level and 
locked before using. All 4 casters must be 
locked before use. Follow all applicable ANSI 
and OSHA guidelines along with province and 
local codes for use of the product. 

A

C

E

B

D

#

DESCRIPTION

QTY.

A

End Frame

2

B

Platform

1

C

Side Brace

1

D

Snap Pin

4

E

5" Caster

4

Locked

Unlocked

Engaged

Disengaged

Locked

Unlocked

Figure 1