PAGE 1 OF 2
0313 IH-3800
π
H-3800
6' STEEL ROLLING
SCAFFOLD
1-800-295-5510
uline.ca
PARTS FOR BASE UNIT
ASSEMBLY INSTRUCTIONS FOR BASE UNIT
NOTE: Identify all components according to
chart above. If any components are missing or
damaged, contact Uline Customer Service.
1. Attach each side brace (C) to end frames (A) at the
desired platform height. Be sure the locking pins on
each side brace are fully locked in the end frame at
all 4 locations. (See Figure 1)
2. Install platform (B) so that it is fully seated and level
in both side braces (C) Be sure the deck pins are in
the engaged position. (See Figure 2)
3. Install 4 casters (E) into both end frames (A) and
secure with snap pins (D). (See Figure 3)
WARNING! Side braces must be level and
locked before using. All 4 casters must be
locked before use. Follow all applicable ANSI
and OSHA guidelines along with province and
local codes for use of the product.
A
C
E
B
D
#
DESCRIPTION
QTY.
A
End Frame
2
B
Platform
1
C
Side Brace
1
D
Snap Pin
4
E
5" Caster
4
Locked
Unlocked
Engaged
Disengaged
Locked
Unlocked
Figure 1
Figure 2
Figure 3