background image

PAGE 1 OF 2 

0712 IH-1205

π

ADJUSTABLE OPEN WIRE SHELVING

1-800-295-5510  

uline.com

INSTALLATION OF SELF-LEVELERS AND OPTIONAL CASTERS

INSTRUCTIONS FOR UNIT ASSEMBLY

03

04

05

06

07

08

09

03

04

05

06

07

08

09

Figure 1

Figure 3

Figure 2

Figure 4

TO INSTALL SELF-LEVELERS

1.  Make sure post is positioned as shown. (See Figure 1)

2.  Insert self-leveler into open end of post. 

3.  Tap on ground until self-leveler slides into post. 

4.  Repeat steps 2 and 3 for other posts. 

TO INSTALL OPTIONAL CASTERS

1.  Make sure post is positioned as shown. (See Figure 2)

2.  Engage the wheel brakes to keep casters from rolling during 

assembly. Use a rubber mallet to tap caster stems into posts.  

(See Figure 2) 

1.  Start with the lowest shelf. Snap the interlocking pieces of a 

shelf support (wide end down) around the post at the lowest 

groove where shelf is to be located. Slide the support up or 

down until it snaps onto the groove. Add a shelf support to the 

same place on the remaining posts. (See Figure 3)

NOTE: NSF requires food service applications to keep the  
lowest shelf at least 6
" above the floor.

2.  Slide post through underside of shelf until shelf slides firmly 

over supports (See Figure 4)

Отзывы: