background image

3 SOLUTION PLATFORM INSTALLATION:

3 Solution platform installation:

1. Test tool preparation:

Test tooling, test equipment

Wireless router

Computer (Internet connection required)

Test camera with camera obscure-box and infrared detection function (normal an-

droid phone is ok)

Special USB cable *2: production method [take the graffiti serial port board +USB
cable (cut the USB head), then connect the serial port board 5V/GND/TX/RX with
the USB cable, pay attention to TX, RX do not connect the reverse, the welding is
completed]

2Solution platform installation

Figure 1:

1.png

Double-click the diagram to start the production test tool

Install the serial driver

According to the computer system and serial port installation, it is recommended

to use CP2102 serial port, figure 1 is win10 64 system driver, figure 2 is win7 64
system driver.

4 / 9

Содержание Voice IR

Страница 1: ...Test guide for Voice IR Device Development Access Mode Product Solution Voice Products Domestic Voice Infrared SoC Solution Version 20200525 Online Version...

Страница 2: ...ontents 1 Objective 2 2 The scope of 3 3 Solution platform installation 4 4 Solution platform operation instructions 5 5 Test rack manufacturing instructions 8 5 1 Production instructions for PCBA tes...

Страница 3: ...Contents This product is only suitable for China 1 9...

Страница 4: ...1 OBJECTIVE 1 Objective Infrared remote control function test operation instructions to facilitate customers to complete product testing 2 9...

Страница 5: ...2 THE SCOPE OF 2 The scope of Voice infrared remote control products 3 9...

Страница 6: ...ke the gra ti serial port board USB cable cut the USB head then connect the serial port board 5V GND TX RX with the USB cable pay attention to TX RX do not connect the reverse the welding is completed...

Страница 7: ...le test series le to nd the corresponding path Figure 2 2 png Figure 3 3 png 2 Click start test and double click to establish the connection line Set the serial port the main serial port is set for th...

Страница 8: ...run to power the device The remote control enters the production and test mode automatically Check the ashing indicator manually click ok the indicator does not ash and click failed Pass the test to t...

Страница 9: ...the next step and test fail to stop the test For infrared transmission and reception test the distance between the two devices is suggested to be about 1m Test pass automatically takes the next step...

Страница 10: ...n instructions for PCBA test rack Figure 6 6 png 1 It is suggested that the button should face up to facilitate employees to test the button 2 PCBA power supply serial port power supply to USB interfa...

Страница 11: ...should be tested sepa rately for aging test Use a camera to take pictures and observe in a dark environment 1 The router with the starting SSID of tuya_mdev_test1 2 Power on the nished product 3 When...

Отзывы: