STEP 3: (Site Layout)
1. Determine which side will be the approach side.
2. Now determine which side you prefer the power unit to be located on. The
MAIN column has the power-unit mounting bracket attached to the side, as
shown in (Fig. 4).
Note: the power unit column can be located on either side. It is helpful
to try and locate the power side on the driver side of the vehicle when
loaded on the lift, in order to save steps during operation.
3. Once a location is determined, use a carpenter’s chalk line to layout a grid
for the post locations. (See Fig. 3)
Fig. 4
4. After the post locations are marked, use a chalk or crayon to make an outline of the posts on the floor
at each location using the post base plates as a template.
5. Double check all dimensions and make sure that the layout is perfectly square.
STEP 4: (Installing MAIN COLUMN w/ Power Unit Bracket)
1. Before proceeding, double check measurements and make certain that the bases of each column are
square and aligned with the chalk line.
2. Ensure Top Cap is pre-installed to the top of the Main column. Raise the column to a vertical position.
3. Using the base plate on the MAIN column as a guide, drill each anchor hole into concrete using a
rotary hammer drill and
3
/
4
” concrete drill-bit. To assure full holding power, do not ream the hole or
allow the drill to wobble. (See Anchoring Details on Page 4)
4. After drilling, remove dust thoroughly from each hole using compressed air and/or wire brush. Make
certain that the column remains aligned with the chalk line during this process.
5.
Assemble the washers and nuts on the anchors then tap into each hole with a block of wood or rubber
hammer until the washer rests against the base plate. Be sure that if shimming
is required that enough threads are left exposed.
6. Using a level, check column plumb for every side (Fig. 5). If shimming is
required, use supplied Shim stock or 3/4” washers, placing shims as close
as possible to the hole locations. This will prevent bending column bases.
7. With the shims and anchor bolts in place, tighten by securing the nut to
the base then turning 2-3 full turns clockwise. Ensure anchor bolts are
tightened to a minimum of 130 ft-lbs. of torque. DO NOT use an impact
wrench for this procedure.
Fig. 5
Содержание TP9KACX
Страница 4: ...4 TP9KACX TP9KSCX Jan 2017 ...
Страница 6: ...6 TP9KACX TP9KSCX Jan 2017 Fig 2a TP9KACX Asymmetric Lift Fig 2b TP9KSCX Symmetric Lift ...
Страница 21: ...21 TP9KACX TP9KSCX Jan 2017 EXPLODED VIEW 1 ...
Страница 22: ...22 TP9KACX TP9KSCX Jan 2017 EXPLODED VIEW 2 ...
Страница 26: ...26 TP9KACX TP9KSCX Jan 2017 ...