
Chapter 1 Fiber Optic Interface Cabling Specifications
Fiber Optic and Ethernet Combo Card Patch Panels
Release TR3.2.1
Turin Networks
Page 2-3
The following graphic orients the card housing with the MPX cable connectors:
Figure 2-1 Fiber Optic Card (viewed from the right side)
Fiber Optic
Backplane
The Traverse fiber optic backplane contains duplex backplane housings for the card
MPX connectors. The fiber optic backplane housings are marked with a white stripe
reference marker to properly orient the MPX connectors. The table below describes the
number of duplex housings and GCM housing slot numbers.
Fiber Optic and
Ethernet
Combo Card
Patch Panels
A fiber optic patch panel may be used to provide access and standard connectors (SC,
FC, ST, LC, or D4) for termination of fiber optic cables from the Optical Distribution
Frame (ODF) and from the Traverse fiber optic backplane. Fiber optic cable with a
MPX female connector on one end must be used to make the connection at the Traverse
fiber optic backplane. An MPX connector on the other end of the fiber optic cable is
optional. Fiber optic cable with fan out for termination to single fiber connectors (SC,
FC, ST, LC, or D4) is another option.
A
B
MPX connectors with a
white stripe reference
mark for fiber position 1
Connector A (upper)
Connector B (lower)
White
Stripe
White
Stripe
Module housing
A (upper)
B (lower)
Table 2-1 Traverse MPX Housing Specifications
Platform
# of Duplex
Housings
GCM Housing
Slot Numbers
Traverse 2000
20
19, 20
Traverse 1600
16
15, 16
Traverse 600
6
5, 6
Содержание TransNav
Страница 5: ...Release TR3 2 1 Turin Networks Page iii Installation and Commissioning Checklists 12 21 Index Index 1 ...
Страница 6: ...Page iv Turin Networks Release TR3 2 1 ...
Страница 14: ...Traverse Installation and Commissioning Guide Calling for Repairs Page xii Turin Networks Release TR3 2 1 ...
Страница 101: ...Chapter 1 Power Interface Specifications PDAP 4S Release TR3 2 1 Turin Networks Page 4 3 ...
Страница 316: ...Traverse Installation and Commissioning Guide Section 12 Appendices Page ii Turin Networks Release TR3 2 1 ...
Страница 361: ......
Страница 362: ...Visit our website at www turinnetworks com Release TR3 2 1 Traverse System Documentation 800 0002 TR321 ...