![turck TN-IOL2 Series Скачать руководство пользователя страница 14](http://html1.mh-extra.com/html/turck/tn-iol2-series/tn-iol2-series_instructions-for-use-manual_1181745014.webp)
Commissioning
Initiating SIO mode
14
Hans Turck GmbH & Co. KG | T +49 208 4952-0 | F +49 208 4952-264 | [email protected] | www.turck.com
7
Commissioning
After connecting and switching on the power supply, the device is automatically ready for op-
eration.
When the device is connected to an IO-Link master, IO-Link communication will start automat-
ically. To do this, the IO-Link master sends a wake-up request to the device.
7.1
Initiating IO-Link mode
Set the cycle time on the IO-Link master.
a
The device is ready for operation.
7.2
Initiating SIO mode
Connect the device to a standard I/O port.
a
The device is ready for operation.
In SIO mode, the functions relating to
data synchronization
and
tag presence
are available. For
more information on setting up the functions, refer to the IO-Link parameters manual.
Содержание TN-IOL2 Series
Страница 1: ...Your Global Automation Partner Instructions for Use TN IOL2 HF Read Write Heads...
Страница 2: ...2 Hans Turck GmbH Co KG T 49 208 4952 0 F 49 208 4952 264 more turck com www turck com...
Страница 36: ...Over 30 subsidiaries and over 60 representations worldwide www turck com 100021277 2021 05 100021277...