Commissioning
Initial commissioning
26
Hans Turck GmbH & Co. KG | T +49 208 4952-0 | F +49 208 4952-264 | [email protected] | www.turck.com
7
Commissioning
7.1
Initial commissioning
7.1.1
Mounting and electrical installation
Set the F address at the module [
28].
Please assure the proper closing of the protective cover over the rotary coding switches
[
Mount the device according to the instructions [
16].
Connect Ethernet cables according to the instructions [
Connect the power supply according to the instructions [
20].
Wire the in- and outputs depending on their use [
Seal unused connectors with the respective protection caps [
19].
Connecting the supply voltage
Before the operating voltage is applied, assure that:
- no wiring or grounding errors exist
- a safe grounding of the device/of the application is guaranteed
Connect the supply voltage.
Check if all supply voltages as well as the output voltage are in the permitted range.
Check if the device works properly or if errors are displayed by controlling the diagnostics
an status displays.
7.1.2
Configuring in Turck Safety Configurator
Configure the device as described in chapter “Configuring the device” [
7.1.3
Commissioning the device at the PLC
Configure the device in the PLC.
Configure the device in the PLC configuration software [
58].
Load parameterization and configuration data via the PLC into the device.
Execute a functional test.
Check if the device works according to the configuration and if all safety functions react
as expected.
Содержание TBPN-L5-4FDI-4FDX
Страница 1: ...Your Global Automation Partner Instructions for Use TBPN L5 4FDI 4FDX Safety Block I O Module...
Страница 2: ...2 Hans Turck GmbH Co KG T 49 208 4952 0 F 49 208 4952 264 more turck com www turck com...
Страница 78: ...Over 30 subsidiaries and over 60 representations worldwide www turck com 100004769 2020 07 100004769...