![turck FS100 L Series Скачать руководство пользователя страница 12](http://html1.mh-extra.com/html/turck/fs100-l-series/fs100-l-series_instructions-for-use-manual_1181573012.webp)
Installing
General installation instructions
Hans Turck GmbH & Co. KG | T +49 208 4952-0 | [email protected] | www.turck.com
V02.00 | 2022/08 | 12
5
Installing
5.1
General installation instructions
For optimal monitoring, mount the sensor such that the probe rod is fully immersed in
the medium.
If the medium flows in a horizontal direction and may contain deposits or trapped gas
(e.g. air bubbles): Mount the sensor e.g. laterally.
Fig. 7: Lateral mounting
If the medium flows in a horizontal direction and the flow channel is not completely filled
with the medium: Mount the sensor e.g. below the flow.
Fig. 8: Mounting below the flow
If the medium flows in a vertical direction: Mount the sensor only in risers.
A minimum distance from potential interference variables (pumps, valves, flow rectifiers,
pipe bends, changes in the cross section) must be maintained.
d
b
a
a ≥ 10 x d
b ≥ 5 x d
Fig. 9: Minimum distances to interference variables
Prevent the tip of the probe rod coming into contact with the opposite side of the flow
channel inner wall.
Содержание FS100 L Series
Страница 1: ...Your Global Automation Partner Instructions for Use FS100 L 2UPN8 Flow Sensors...
Страница 4: ...Contents Hans Turck GmbH Co KG T 49 208 4952 0 more turck com www turck com V02 00 2022 08 4...
Страница 34: ...Over 30 subsidiaries and 60 representations worldwide www turck com 100002085 2022 08 100002085...